365 / Instruction #8920101 Rev 4
Pg. 6
Fig. 8
CLAMP
T-HANDLE
7.
With Uprights centered with the Number “0” on each of the base legs, tighten each clamp securely,
turning the T-handle clockwise. This will secure the uprights in place (Fig. 8).
8.
Insert the Cantilever Bar Uprights, with Assembled Adjusting Brackets, all the way into the Base
Uprights as shown (Fig.9), until they bottom out, and then lift upward until the Snap Lock engages,
& then tighten the Spin Lock Handle Clockwise. Ensure the Spin-Snap Locks are both properly
engaged and tightened!
Note: Ensure the Cable Connection links point away from center and the Adjusting
Brackets face in the same direction when inserting the Assembled Cantilever Bar
Uprights c/w Adjusting Brackets into the Base Upright as shown in Figure 9.
9.
Before installing the rails, discard the 2" bolts that come attached to the rail ends. A longer 3"
bolt is supplied in your cantilever hardware bag .The rails can now be attached to the high and low
adjusting brackets as shown (Fig. 9).
BASE UPRIGHT
Fig. 9
NYLOCK NUT
ENSURE THE CABLE
CONNECTION LINKS POINT
AWAY FROM CENTER
LOCK WASHER
PLAIN WASHER
3” BOLT
(Discard 2” bolts supplied with Rail)
SPIN-SNAP LOCK
SNAP LOCK
SPIN LOCK HANDLE
CANTILEVER BAR
UPRIGHTS
Proceed to the Cable Tie down &
Floor Anchoring Section.