values an stop and from the charging port and 
service port for gas stop valve.

2.

3.

Insert a key hexagon socket screw into the valve 
inside of charging port for gas stop valve. 
Meanwhile, unscrew the liquid stop valve open anti-

clockwise for half circle continuing 8-10 sec. Then 

open the valve of charging port. 

4. Open the gas stop valve an d liquid stop valve 

completely using a key hexagon socket screw for 
unscrewing the valve inside anti clockwise.

5. Screw the caps of service ports (for both liquid and 

gas) and the charging port.

Leakage D etecting

 

After connecting the pipes check every joint port, service ports and the charging port and the charging port 
for gas leakage with a leak detector or soapy water.  

Insulation of joints and binding of piping

1. Insulate flare joints of the indoor heat exchanger and the connection piping with insulation so that no parts 

of them are exposed, which will eliminate dripping of condensation.

2. The connection piping between indoor and outdoor unit should be bound with tape. 
3. If the connection piping goes through the roof, washing room or other high temperature and high humidity  

places, additional insulation material (optional) must be used to prevent condensation.

CAUTION

Do not let dirt moisture or other matter get in connection piping during installation 
The bending radius of piping should be more than 100mm
It is better to use torque wrenches. Do not use adjustable wrenches. If you use a solid wrench, the 

tightening torque can

be estimated as follows: when a flare nut is tightening with a spanner and the 

tightening torque starts to increase r

apidly, stop temporarily, then turn through 60-90 angle.

If the pipe length is more than 3m, charge the system with additional refrigerant. 

Draining P iping Work

In order to confirm that the waste water is drained out  reliably, install the drain pipe so that it slopes downward  
(Diagram 1)
Do not Install is as shown from (diagram 2) or Diagram 5) 

 

(Diawing 1)

Remove the air in the indoor unit and piping

The air, moisture and other foreign matter in the indoor unit or piping may cause operation current overloading

 and cause blocking of capillary tube. This leads to operation failure. Remove the air or moisture as follows:  

Remove the caps from the service port of liquid stop 

 

Sealing of  the wall hole and fixing of the piping

1. Seal the gap between socket and wall hole using sealing compound 

 

2. Fix the piping to the wall or pointed position with band.

If the drainage hose provide in the indoor unit is not long enough the drainage hose provided in the 
accessories box can be joined together.

If the drain hose passes through an indoor area, bind it with tape together with the connection piping 

(about its mounting requirements refer to p15)

Water  leakage  Water  wave

Drainage being

detained

Air

Water  leakage  

Do not lift up!

Less  then  50mm  follow  the  ground

Water  leakage  

The end of drainage
pipe being dipped
into water

D r a i n  h o s e

H o s e  ( l D   15 m m )
o r   v in y  I   c h lo r i d e  t y p e  t u b e

18| 

Page

19 | 

Page

Charging part

Solar panel 

Solar panel connector

Solar panel's pipe

Solar panel's pipe

Liquid pipe

Stop valve

Spanner

Service part cap

Service part cap

Gas pipe

Stop valve

Stop valve

Slope downward

(Diawing 2)

(Diawing 3)

(Diawing  4)

(Diawing  5)

W a l l  h o l e  c o v e r

I n d o o r  u n i t

F i x   wi t h  
p i p i n g  b a n d

S e a l  t h e   ga p  
u s i n g  s e a l i n g 
c o m p o u n d

F a s t e n  w i t h  s c r e w

P i p i n g  b a n d

Cut  off 
superfluous  part

Summary of Contents for TKF-26GW/BP

Page 1: ...P 9000BTU TKF R 35GW BP 12000BTU TKF R 50GW BP 18000BTU TKF R 70GW BP 24000BTU TKF R 100GW BP 36000BTU TKF R 120GW BP 41000BTU TKF R 140GW BP 48000BTU SOLAR AIR CONDITIONER OPERATION AND INSTALLATION...

Page 2: ...ting Page 18 Draining Piping Work Page 18 Sealing of the Wall Hole Fixing of the Piping Page 19 Electric Wiring Connection Trial Operation Page 20 Electric Wiring Connection Page 20 Trial Operation Pa...

Page 3: ......

Page 4: ...ration 1 Press the ON OFF button to stop the air conditioner 1 Press the ON OFFbutton to start the air conditioner 2 To select AUTO mode press the Operation select button Each time the button is press...

Page 5: ...he TIMER ON button and the will flash on the screen 3 When the icon flashes the start timer can be set Press the HOUR and Minute buttons to adjust the required time 4 Once the start time has been set...

Page 6: ...considering yourhealth we recommend you use the unit as follows If the air conditioner cannot be operated ensure 1 The power plug is connected The switch is turned on and the fuse is not blown 2 The l...

Page 7: ...humidity etc Cleaning of the Air Filter and Deodorising Filter Cleaning the air filter every 2 weeks 1 Open the front panel to the position as shown and remove the air filter The position of the fron...

Page 8: ...his is the sound of refrigerant flowing inside the air conditioner 8 Mist appears during COOL operation The indoor warm air is cooled when the room temperature and the humidity is high When the room t...

Page 9: ...UT 9 52 3 8 12 7 1 2 6 35 1 4 22000 24000 BUT 9 52 3 8 15 88 5 8 9 52 3 8 Pipe Diameter inch Tightening Torque kgf cm 1 4 220 280 3 8 350 420 1 2 530 590 5 8 750 800 3 Refrigerant and drainage piping...

Page 10: ...rts to increase rapidly stop temporarily then turn through 60 90 angle If the pipe length is more than 3m charge the system with additional refrigerant Draining Piping Work In order to confirm that th...

Page 11: ...ightly Trial operation Before trial operation be sure to check for looseness in wiring and mistaken polarity etc 1 Connect the power plug then turn on the mains switch Observe if the operation indicat...