background image

 

FRONTIER II JUMP STAND 

INSTALLATION CHART 

Refer to Fig.1 

 

Frontier II 

Stand with 

Jump 

Board 

Length 

ANSI/NSPI-5 

2003  

Pool Type 

Distance For Setting 

Front Bolt of Jig From 

Water’s Edge 

“S” 

Min. Overhang 

± 3” 

 

“WA*” 

Max. Height of Board 

Above Water 

 

“HOW” 

6’ 

I or II 

26” 

18” 

20” 

6’ III 

20” 

24” 

26” 

8’ III 

34” 

24” 

26” 

6’ IV 

14” 

30” 

30” 

8’ IV 

28” 

30” 

30” 

FRONTIER II 

8’ V 

22” 

36” 

40” 

IMPORTANT: The distance for setting the front bolt of the jig “S” from the waters edge is valid only if the 
minimum water depth is maintained at the tip of the board noted at point A in ANSI/NSPI-5 2003, Figure 3 
and Table 1.  If minimum water depth is not maintained the distance “S” must be adjusted accordingly. 

 
*WA DIMENSION IS VALID ONLY IN CONJUNCTION WITH MIN. DEPTH AT POINT A (SEE ANSI/NSPI-5 2003 
FIGURE 3 AND TABLE 1) FOR POOL TYPE.   
NOTE: When coping is used do not set front bolts of jig closer than 3" from the back edge of coping. 
 

INSTALLATION INSTRUCTIONS

 
BE SURE CONCRETE DECK SURROUNDING ANCHOR JIG COMPLIES WITH MINIMUM DIMENSIONS AS SHOWN 
IN FIG. 1 FOR POOL TYPE AND BOARD TO BE USED. 
 
1. 

READ CAREFULLY the following, and pages A through E, which have been extracted from ANSI/NSPI-5 2003 and 
pay particular attention to Figure 3 and Table 1 set forth therein. 

 
2. 

The Frontier II three-bolt jig should be set in accordance with the INSTALLATION CHART above and Fig. 1, with the 
"RED" capped bolt closest to the pool. This will give the desired minimum overhang. Board must be placed at deep 
end of pool on centerline. 

 
CAUTION: Before pouring concrete around jig, check the bolt pattern of jig to Fig. 2. It is possible that they have become 

misaligned through shipping and handling. 

 
3. 

Make sure bolts project out of concrete 1-1/2" with ample concrete depth below jig. Refer to Fig. 1 for minimum deck 
thickness, width and length.  

 
4. 

When finishing deck surface, maintain a LEVEL DECK SURFACE where jig bolts project out so that the stand makes 
uniform contact with deck.  

 
5. 

Before mounting stand, chisel away any excess concrete that may have built up around jig bolts and remove the red 
and yellow bolt caps.  

 
6. 

Place stand over jig bolts and secure according to Fig. 2. Tighten ANCHOR hex nuts. Tighten all MOUNTING and 
ANCHOR hex nuts according to the TIGHTENING SCHEDULE in Fig. 1.  

 
7. 

With Frontier II stand properly secured, select board size according to INSTALLATION CHART above. Take the 
White Rubber Step Bolt Caps and pullover the heads of the 1/2" x 3" long Step Bolts. When inserting Step Bolts 
through the board holes, tap with a rubber mallet in order to obtain a snug fit. Secure Frontier II jump board to stand 
according to Fig. 2 and tighten MOUNTING hex nuts. 

 
8. 

The top surface of the diving board shall be level from side to side. 

 
 
 
 
 

ONLY ONE PERSON ON A JUMP BOARD AT A 
TIME, WITH A MAXIMUM WEIGHT OF 250 LBS. 

 
 
 
 
 
 
 

Summary of Contents for FRONTIER II

Page 1: ...LY The S R Smith Frontier II Jump Stands are designed to be easily transported and installed Follow all instructions carefully and inspect closely to assure proper and safe installation PROPER INSTALLATION CANNOT BE OVERSTATED IMPROPER INSTALLATION VOIDS S R SMITH S WARRANTY AND MAY AFFECT THE SAFETY OF THE USER ASSEMBLY AND INSTALLATION INSTRUCTIONS PLEASE READ CAREFULLY WESTERN SALES AND MANUFAC...

Page 2: ...URE TO USE ANTI SEIZE COMPOUND MAY RESULT IN GALLING AND SEIZING OF THE HARDWARE FIG 1 FIG 2 FRONTIER II MOUNTING BOLT KIT 69 209 032 SS FRONTIER II SPRING ANCHOR BOLT KIT 69 209 033 SS 1 STEP BOLT HEAD CAP WHITE RUBBER 3 EA 2 1 2 X 3 LG STEP BOLT S S 3 EA 3 1 2 X 1 1 2 ROUND NYLON WASHER 3 EA 4 1 2 X 1 3 8 FLAT WASHER S S 3 EA 5 1 2 LOCK WASHER S S 3 EA 6 1 2 HEX NUT S S 3 EA 7 1 2 WHITE PLASTIC ...

Page 3: ...with the INSTALLATION CHART above and Fig 1 with the RED capped bolt closest to the pool This will give the desired minimum overhang Board must be placed at deep end of pool on centerline CAUTION Before pouring concrete around jig check the bolt pattern of jig to Fig 2 It is possible that they have become misaligned through shipping and handling 3 Make sure bolts project out of concrete 1 1 2 with...

Page 4: ...xcept where noted as maximum 4 One half 1 2 the width shown at each point shall be available on each side of the diving equipment centerline 5 Minimum water depth under tip of diving board Point A is important to maintain SEE TABLE 2 FOR DIMENSIONS F N K J B L C L SYM M N L C SYM D 6 R MAX H A L C SYM C L C SYM 2 3 R MAX G F CROSS SECTION AT POINT C WATER LEVEL WATER LEVEL CROSS SECTION AT POINT A...

Page 5: ...shape of pools except that consideration shall be given to shape from the standpoint of circulation of the swimming pool water and safety to the user 5 3 Walls requirements 5 3 1 Walls in the shallow area and deep area of the pool shall not slope greater than 11 1 5 slope ratio to a transition point The transition point shall not be less than 2 feet and 9 inches 83 8 cm below the waterline See Fig...

Page 6: ... minimum diving water envelope shall be plumb or outside of Type 1 water geometry See figure 3 ta ble 1 5 4 Maximum allowable wall slope 5 4 1 Maximum allowable wall slope shall not slope greater than 11º from plumb Figure 3 Minimum water envelope B ...

Page 7: ...llow end except as specified in 6 3 5 6 3 The slope of the floor from the point of the first slope change toward the deep end shall not exceed 1 foot in 3 feet 30 cm 91 cm Table 1 Minimum water envelope Minimum depths at point Minimum widths at point Minimum lengths between points Pool type A B C D A B C D WA AB BC CD DE WE O Manufactured diving equipment is prohibited I 6 0 7 6 5 0 2 9 10 0 12 0 ...

Page 8: ... surfaces 5 9 Figure 3 contains suggested drawings and diagrams for minimum water envelope for swimming pools designated type I V Individual pool types are shown in figure 3 and table 1 5 9 1 Location of point A Point A shall be defined as a point located on the minimum water envelopes 5 9 1 1 Point A Point A is a construc tion location nearest the deep end wall where the minimum water depth is sa...

Page 9: ...or Residential Inground Swimming Pools contact Figure 6 Top view examples of accessory equipment and pool features prohibited in the water envelope National Spa and Pool Institute 2111 Eisenhower Avenue Alexandria VA 22314 Phone 703 838 0083 Fax 703 549 0493 www nspi org E ...

Reviews: