Setting the Pole
1. Set the outriggers and level the machine.
2. Unwind winch line to avoid two-blocking.
3. Extend the boom out until the unit stops.
4. Raise the boom to at least 60 degrees elevation.
5. Fiberglass final stage must be fully extended for dielectric insulation!
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com