Rutland FM1803-2
Installation & Operation
Document No: SM-146 Issue D 14.03.08
Marlec Engineering Co Ltd
2
CONTENTS
Page
INTRODUCTION................................................................................ 3
CHECK YOU HAVE RECEIVED....................................................... 4
WHAT YOU WILL NEED, TOOLS, OTHER..................................... 4
SITING THE WINDCHARGER.......................................................... 5
SYSTEM DESCRIPTION & PRINCIPLE OF OPERATION………. 6
Aerofoil Blades
Generator
Tail Assembly
Control Unit
MOUNTING TOWER ………….……………………………………. 10
ASSEMBLY & INSTALLATION........................................................ 12
Blade & Hub Assembly.......................................... 12
Tail Assembly……………………………………. 14
Tower Preparation..............................……………. 15
Control Unit Installation………………………….. 16
BATTERIES.....................................................................................… 17
CABLE SPECIFICATION................................................................... 18
ELECTRICAL CONNECTION........................................................... 19
FITTING GENERATOR TO THE TOWER………………………… 20
Final Mechanical check…………………………. 20
UP AND RUNNING........................................................................... 21
SPECIFICATION AND PERFORMANCE......................................... 22
INSPECTION AND MAINTENANCE............................................... 23
TROUBLESHOOTING....................................................................... 24