Rutland FM1803-2
Installation & Operation
Document No: SM-146 Issue D 14.03.08
Marlec Engineering Co Ltd
12
ASSEMBLY AND INSTALLATION OF THE WINDCHARGER
Blade & Hub Assembly
The blade hub rear assy complete with blade bolts is pre-fitted to the generator
shaft, this must not be removed to fit the turbine blades.
Fig 3. Blade Hub Assembly
Turbine Blade
Flat Side of
Blade
M8 Nylock
Nuts
Hub Front Plate
M8 washers
Hub Rear Assy
with protruding
blade bolts
‘D’ washer
Tab washer
M10 x 25
screw
Spinner fixing
boss