
Q910-US00 User Guide
Part Number: P01-Q910-US00
21
Physical Installation of Q910 LTE Access
Point
Mounting Instructions
3.
If required, suspend AP by attaching a carabiner to the hoisting loop on the AP bracket.
NOTE
This kit may include extra screws, nuts, and washers. You may use the extras wherever required.
4.
Continue with
Step 7: Setting the Elevation and Tightening the Elevation Bolt
on page 17.
Step 7: Setting the Elevation and Tightening the Elevation Bolt
1.
Set the elevation required by AP.
2.
Tighten the M8 bolt to13.6 N-m (10 ft-lbs.)
3.
Continue with
Step 8: Earth Grounding the AP
on page 17.
Step 8: Earth Grounding the AP
CAUTION
Make sure that earth grounding is available and that it meets local and national electrical codes. For
additional lightning protection, use lightning rods and lightning arrestors.
NOTE
The color coding of ground wires varies by region. Before completing this step, check your local wiring standards for guidance.
Using the factory-supplied ground wire and ground screw/ washer set, connect a good earth ground to the AP chassis ground point.
CAUTION
Q910 AP includes one 12 mm stainless steel M6x1 earth ground screw with split lock and flat washers.
Make sure that any replacement screw is no longer than 12 mm. If a screw is longer than 12 mm, it can
damage the AP chassis.
FIGURE 10 Connect good earth ground to AP here