6
Chapter 2.
Installation and Basic Configuration
This chapter describes the procedures of installing the OW-2000.
2.1
Before You Start
After unpacking the system, make sure the following items are present
and in good condition. Refer to below pictures for product image.
1.
OW-2000 Outdoor Wireless Access Point/Client Bridge unit
2.
100~240VAC, 50~60Hz AC to 48V/0.375A DC switching
adapter
3.
Inline Power Injector (PoE) 48VDC, 0.375A
4.
RJ-45 CAT-5 Ethernet cable 30 m
5.
RJ-45 CAT-5 Cross-over Ethernet cable 1.8m
6.
Grounding wire 1.8m
7.
User manual CD-disc
8.
Wall/mast mounting kit, including one (1) band clamp
9.
Screws
10.
5dBi Oimi-type Antenna (for AP)
1. Unit
2. Adapter
3. PoE
4. 30m cable
5. 1.8m cable
6. Grounding wire 7. CD
8. Wall mount
9. Screws
10. Antenna(for
AP)