60 System Operation
BTR-800, TR-800, TR-825
Power-Up Screens
•
The first screens displayed when the beltpack is powered up
are the software and channel map version screens.
•
The 1st screen displayed indicates the beltpack’s software
version number. It is displayed for about one second.
•
The 2nd screen displayed indicates the beltpack’s channel
map (frequency plan) version number. It is displayed for
about one second. The operating screen is then displayed.
•
The final screen displayed is the group/channel screen.
Summary of Contents for BTR-800
Page 2: ...2 BTR 800 TR 800 TR 825...
Page 6: ...8 Introduction BTR 800 TR 800 TR 825 FIGURE 1 BTR 800 Block Diagram...
Page 10: ...12 BTR 800 Base Station BTR 800 TR 800 TR 825...
Page 14: ...16 TR 800 Beltpack BTR 800 TR 800 TR 825...
Page 18: ...20 TR 825 Beltpack BTR 800 TR 800 TR 825...
Page 32: ...34 Initial Equipment Setup BTR 800 TR 800 TR 825...
Page 34: ...36 Pre Walk Thru Checklist BTR 800 TR 800 TR 825...
Page 70: ...72 System Operation BTR 800 TR 800 TR 825...
Page 72: ...74 System Walk Thru BTR 800 TR 800 TR 825...
Page 74: ...76 Troubleshooting BTR 800 TR 800 TR 825...
Page 76: ...78 Tech Tips BTR 800 TR 800 TR 825...
Page 78: ...80 Battery Information BTR 800 TR 800 TR 825...
Page 80: ...82 Intercom Systems Specifications BTR 800 TR 800 TR 825...
Page 84: ...86 Accessories and Replacement Parts BTR 800 TR 800 TR 825...