background image

 

12

DEFAULT VALUES 

D E F A U L  T    V A 

S     

                                   
                                   
                      C O N  T  I  N U E ?

 

F  I  L  L    C Y L  I  N D E R    T A R G E T

A M O U N T    # #  .  # #    K G       
B E T W E E N    3    &   1  1    K G   

                      C O N  T  I  N U E ?

 

 

 

M  I  N  I  M U M    V  A C U U M    L  E A K

L  # 

#  I 

G      

B E T W E E N    1  5    &    2  5    I  N H G

                      C O N  T  I  N U E ?

 

 

 

D E F A U L  T    V A C U U M    L  E A K

T  I  M E    #  #    M  I  N               

B E T W E E N    1    A N D    9  9    M I N

                      C O N  T  I  N U E ?

 

 

H O S E S    O V E R C H A R G E     

T  # . # 

#  K 

G     

B E T W E E N    0    &    0  .  9  9   K G

                      C O N  T  I  N U E ?

 

MAINTENANCE OPTIONS 

P E R F O R M   C A L  I  B R A T I O N

C H  E  C  K  ?                         

                     

         

   

S E L E C T    Y E S    O R    N O     

 

 

A T T A C H   W E I G H T   T O     
B O T T O M    O F    M A C H  I  N E   

                     

         

   

                      C O N  T  I  N U E ?

 

 

C  A L  I  B R A T  I  O N    A P P  R O V E D

                                   
                     

         

   

                      C O N  T  I  N U E ?

 

Or the next screen may be displayed… 

 

Press 

START

 key. 

 

 

The Fill Cylinder procedure will automatically transfer 
refrigerant from a new cylinder of refrigerant to the 
internal RHS980 charge cylinder. The value set here 
will be the amount of refrigerant which will have been 
transferred when the procedure stops automatically. 
Enter an amount between 3 and 11 kg. The value will 
be displayed as it is entered. Press 

START 

key. 

The A/C system can be checked for leaks using a 
vacuum leak test. This test will pull the A/C system into 
a vacuum and then pause for a period of time. During 
this time, the vacuum level will be monitored. If the 
vacuum level decreases, it’s an indication that the A/C 
system has a leak. This screen prompts for the level of 
vacuum to be drawn. Enter an amount between 15 
and 25 InHg of vacuum. The value will be displayed as 
it is entered. Press 

START

 key. 

This screen prompts for the length of time to monitor 
the vacuum level to determine if there is a leak in the 
A/C system. Enter a number of minutes between 1 and 
99. The value will be displayed as it is entered. Press 

START

 key. 

 

A small overcharge of refrigerant is necessary to 
compensate for refrigerant which will remain in the 
hose after a charge procedure. Enter the number of 
KG between 0 and 0.99. The value will be displayed 
as it is entered. Press 

START

 key. 

 

The calibration of the weight scale in the RHS980 can 
be easily checked using this procedure. A steel ball of 
a precise weight is provided with the RHS980 for 
performing this calibration check. Press 

YES

 key. 

 

The screen prompts to attach the steel ball to the 
bottom of the machine. There is a small post which 
protrudes through the bottom plate of the RHS980 
(see Parts Identification at rear of this Operation 
Manual). This post is magnetic. Attach the calibration 
weight to this post. Press 

START

 key. 

 

This screen will display if the weight scale is in 
calibration. Or, see next page for screen which will 
display if the weight scale is not in calibration. 

Summary of Contents for RHS 980

Page 1: ...RHS 980 Operation Manual RTI Technologies Inc 10 Innovation Drive York Pennsylvania 17402 USA Phone 717 840 0678 Toll Free 800 468 2321 Web site www rtitech com Manual P N 035 81361 00...

Page 2: ...ou have purchased one of the finest Recovery Recycling and Charging Machines certified to SAE Standard J2788 Fill out and return the Warranty Card within 90 days to activate warranty and free lifetime...

Page 3: ...2 NOTES...

Page 4: ...Enable A C Capacity Database Default Values 12 Fill Cylinder Target Amount Minimum Vacuum Leak Level Vacuum Leak Time Hose Overcharge Amount Maintenance Options 12 Calibration Check Perform Calibratio...

Page 5: ...entry of data such as charge amount and given options such as vacuum leak test Once the necessary data has been entered the RHS980 will automatically perform the complete A C service and alert the tec...

Page 6: ...RHS980 to moisture or operate in wet areas 9 Use the RHS980 in locations with ventilation that provides at least four air changes per hour 9 Service hoses must be constructed of the proper materials a...

Page 7: ...tive procedure The alpha numeric keypad is used to enter data when prompted on the LCD screen Note The key also has U M printed on it Pressing this key will toggle the units of measure displayed on th...

Page 8: ...tion three wire grounded 14 AWG or larger extension cord of the shortest possible length R T I T E C H N O L O G I E S R H S 9 8 0 S E L E C T L A N G U A G E E N G L I S H E S P A O L F R A N A I S D...

Page 9: ...cycle and charge R134a Take extreme precaution to ensure that other refrigerants are not recovered into the RHS980 A refrigerant identifier is recommended for evaluating refrigerant in the A C system...

Page 10: ...ress YES key if a vacuum leak test is required Otherwise press NO key Press YES key if oil is to be injected into the A C system Fill the oil bottle on the side of the RHS980 with new oil Otherwise pr...

Page 11: ...o that oil can be injected if oil injection was selected previously Check the oil drain bottle to determine how much oil was removed from the A C system Open valve on new oil bottle until desired amou...

Page 12: ...eens DEFAULT VALUES MAINTENANCE OPTIONS and TOTAL CAPACITIES These four setup procedures are described below Press START key The first option is to select the language which be used to display screens...

Page 13: ...of time During this time the vacuum level will be monitored If the vacuum level decreases it s an indication that the A C system has a leak This screen prompts for the level of vacuum to be drawn Ente...

Page 14: ...the RHS980 to the vapor port of a refillable DOT cylinder Open the valve on the cylinder Press START key Refrigerant will be transferred from the RHS980 internal cylinder into the externally connecte...

Page 15: ...cate the need to go to recycle mode to eliminate the pressure This screen will display if pressure was not detected Replace the combo filter Note the serial number on the new combo filter label as it...

Page 16: ...rt will display when the filter life is at 100 lbs The RHS980 will shut down when the filter life is at 150 lbs A new filter must be installed and a serial number entered to re start the RHS980 A spec...

Page 17: ...4 New Refrigerant not included 5 Condenser Fan 6 Control Power Supply 7 Combo Filter 8 Charge Cylinder 9 Load Cell 10 Control Board 11 Oil Bottle Used 12 Oil Bottle New 13 Vacuum Pump 14 Compressor 1...

Page 18: ...17...

Reviews: