13. Connect the pump tubes with the "quick connect" to the cubitainers and close the drawers.
14. Mount new tube in the pumps, close the clamp system again.
15. Connect the new pump tubes to the mix vessel. C1 for top cubitainer (T28), C2 for bottom container
(T29).
16. After replacement of the peristaltic pump tubes: confirm the replacement, the instrument primes tubing
and rinses the mix vessel.
17. Monitor for leaks prior to replace the panels.
18. Replace the left panel and top panel (if no other maintenance action is needed).
19. Confirm that replacement is correctly performed.
Production will resume.
20. Dispose of removed parts according to local regulations.
Maintenance
MRN-184-EN Version 6 (05-01-2022)
81