39
(4)Screw and tighten the screw (shown no.2).
(5)Pour approx. 950mL engine oil through the fill opening of oil cap/dipstick (shown no.1).
(6)Screw and tighten oil cap/dipstick (shown no.1).
(7)Start the engine and let it run for several minutes. Stop the engine and let it cool down.
(8)Check engine oil level again whether to meet the requirements.
Summary of Contents for GP125S
Page 1: ......
Page 2: ......
Page 22: ...21 2 General tools No Name Picture 1 T sleeve 8 10 12 14 2 Tool case 1 ...
Page 23: ...22 3 Tool case 2 4 Spring pliers 5 Screwdriver ...
Page 24: ...23 6 Pliers 7 Nylon hammer 8 Multimeter ...
Page 55: ...54 ELECTRICAL SYSTEM Components arrangement ...
Page 56: ...55 ...
Page 60: ...59 Harness diagram ...
Page 61: ...60 Conceptual diagram ...
Page 69: ...68 ...
Page 73: ...72 4 Unscrew and remove the 2 screws shown no 9 5 Take down the air filter and front fender ...
Page 105: ...104 ...
Page 108: ...107 ...
Page 110: ...109 2 Use special tool to compress valve spring and take out valve lock clip ...
Page 144: ...143 Throttle valve disassembly and installation 1 Remove the fuel tank 2 Disconnect the plug ...
Page 161: ...160 COOLING SYSTEM System composition ...
Page 170: ...169 ...