Assembly & Set-Up
3
7
Contents of Carton
•
One Chipper/Shredder Vacuum
•
One Operator’s Manual
•
One Engine Operator’s Manual
•
One Upper and Lower Handle
•
One Hose Assembly
•
One Safety Glasses
•
One Bag
•
One Bottle of Oil
•
One Hose Extension
Assembly
NOTE:
This unit is shipped without gasoline or oil in the engine.
Fill up gasoline and oil as instructed in the accompanying engine
manual BEFORE operating your chipper shredder vacuum.
Handle
1.
Remove the hairpin clips from the handle brackets and the
carriage screws and wing nuts from the lower handle.
a. Place the bottom holes in lower handle over the
pins on the handle brackets with notch in handle
pointing downwards and secure with hairpin clips.
See Figure 3-1.
a
b
b
Figure 3-1
b. Insert carriage screws through upper hole in lower
handle from the inside and secure with wing nuts.
See Figure 3-1.
2.
Unfold the upper handle until it aligns with lower handle.
Make sure the rope guide is on the right side of upper
handle. See Figure 3-2A.
a
b
Figure 3-2
3.
Secure the two handles by tightening the star knobs
(carriage bolts must be seated properly into the handle).
See Figure 3-2B.
Summary of Contents for CSV 060
Page 19: ...Notes 19 10 ...