INSTALLATION REPORT
REV 062718
H85 SERIES
OFFICE USE ONLY
Route to: Servicer Mgr Accounting Andy Accounting
Warranty Exp Date
________
ROTTLER MANUFACTURING MUST HAVE THIS REPORT RETURNED
TO PROPERLY QUALIFY WARRANTY ON EQUIPMENT
Customer:____________________________ Address:_______________________________________
City:_________________________________ State:_____ Zip:_________ Phone:_______________
Country:______________________________
Machine Model:___________ Serial Number:__________ Representative:________________________
MACHINE INSTALLATION:
Electrical information MUST be complete to validate this report.
Customer responsibility prior to the arrival of Rottler Sales/Service technician.
Please Initial each item when it is completed.
VERY IMPORTANT:
Modern design machines contain electronic low voltage
circuitry that provides great advantages and a better machine life. BUT, you
must have an excellent, stable, isolated power supply along with an isolated
ground. If not, electrical noise problems are likely to interfere with machine
operation unexpectedly.
Customer is responsible for providing electricity to machine in a manner that meets the local
electrical code requirements.
______Remove machine from truck. Weight: 2,500 lbs.
______Provide solid foundation for machine.
______Remove fixturing and misc. from machine and clean.
______Install machine on foundation with jack pads under jacking bolts.
______Level machine. When level all leveling bolts should have equal pressure on them.
______This machine requires between 208 and 240 Volts AC, Three Phase, 50/60 Hz, isolated power
supply.
If this machine is being installed in a location without 3 phase power, follow
the single phase wiring hookup shown in the installation section of the
manual
______Measure the incoming voltage between L1 and L2, L2 and L3, L1 and L3. Measure the incoming
AC voltage at least twice during installation.
L1 to L2 __________ VAC
L2 to L3 ___________VAC
L1 to L3 __________VAC
L1 to L2 __________ VAC
L2 to L3 ___________VAC
L1 to L3 __________VAC
______This machine should have an external breaker rated at 25 Amps, continuous draw.
______Measure each leg of the incoming supply to ground. Sometimes you may find a “high” leg to
ground. When this happens make sure the high leg is running to L3.
L1 to ground ___________VAC L2 to ground __________VAC L3 to ground ________VAC
Neutral and machine ground are not the same thing. You should measure an
open circuit between Neutral and ground.
Summary of Contents for H85A
Page 2: ......
Page 4: ......
Page 10: ...Section 1 Introduction H85A Manual www rottlermfg com 1 5 Specifications...
Page 18: ...Section 2 Installation H85A Manual www rottlermfg com 2 7...
Page 23: ...Section 2 Installation H85A Manual www rottlermfg com 2 12 Top View...
Page 66: ...Section 4 Control Definitions H85A Manual www rottlermfg com 4 26...
Page 106: ...Section 5 Operating Instructions H85A Manual www rottlermfg com 5 38...
Page 112: ...Section 6 Maintenance H85A Manual www rottlermfg com 6 5 Grease Fitting Locations...
Page 120: ...Section 6 Maintenance H85A Manual www rottlermfg com 6 13 Z Axis Motor Belt Adjustment...
Page 126: ...Section 6 Maintenance H85A Manual www rottlermfg com 6 19...
Page 128: ...Section 7 Troubleshooting H85A Manual www rottlermfg com 7 1...
Page 132: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 2 Oiler and Filter Assembly...
Page 133: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 3 Linear Rails and X Axis Rack...
Page 134: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 4 Coolant Pump Assembly...
Page 135: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 5 Doors...
Page 136: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 6 Base Plate Assembly...
Page 138: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 8 Linear Rails...
Page 139: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 9 Oiler Distribution Block...
Page 140: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 10 Z Axis Motor Assembly...
Page 141: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 11 Inner Wire Track Assembly...
Page 143: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 13 Upper Section...
Page 144: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 14 Outer Wire Track Assembly Mounts...
Page 145: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 15 Wire Tracks...
Page 147: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 17 Inner Components...
Page 149: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 19 Feed Motor Assembly...
Page 150: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 20 Lower Section...
Page 151: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 21 Spindle Drive Motor Assembly...
Page 152: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 22 Spindle Drive Cover...
Page 154: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 24 Inside Parts...
Page 155: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 25 Inside Components...
Page 156: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 26 Computer Components...
Page 157: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 27...
Page 158: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 28 Electrical Panel Assembly...
Page 160: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 30 Pendant Mount...
Page 161: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 31 Coolant Sump Tank...
Page 162: ...Section 8 Machine Parts H85A Manual www rottlermfg com 8 32 Wiring Diagram...
Page 164: ...Section 9 Options H85A Manual www rottlermfg com 9 2...