18
5
INSTALLATION AND OPERATION
5.1 Unpacking
Carefully unpack the rotary vane pump. Keep all paperwork and inspection tags for future reference.
Check the pump for:
•
Transport damage
•
Conformity with the specifications of the supply contract (model, electrical supply data)
•
Completeness of the delivery
Please inform us without delay if there are discrepancies between the delivery and the contractually
agreed scope of delivery, or if damage is detected. Please take note of the general terms of business
of the manufacturing firm.
In case of a claim under warranty, the device must be returned in packaging that is suitable for
protecting it during transport.
5.2 Pump Mounting
For more rigid mounting requirements the pump base can be bolted directly to a surface using
the 2 mounting holes and 2 slots featured on the base.
Fig. 7 Pump mounting