ROTEX Heating Systems GmbH
54
10
TECHNICAL SPECIFICATIONS
Unit category
C13; C33; C43; C53; C63; C83:C93
Initial gas pressure
G20: 20 mbar, G31: 30, 37 or 50 mbar, G25: 25 mbar
Suitable for gas
IT, ES, CZ : II2H3P
FR : II2Esi3P
DE : II2ELL3P
BE : I2E(S)
PL : II2E3P
Technical data
RKOMB*AAV1
22
28
33
Domestic water
Nom. load upper value*
kW
6.2 – 24.6
7.9 – 31.1
8.0 – 36.3
Nom. load lower value*
kW
5.6 – 22.1
7.1 – 28.0
7.2 – 32.7
Nom. output*
kW
6.1 – 21.0
6.6 – 26.2
7.9 – 31.5
Domestic water threshold
l/min
2
Domestic water quantity 60°C
l/min
6
7.5
9
Domestic water quantity 40°C (mixed)
l/min
10
12.5
15
Domestic water temperature
°C
60
Effective unit wait time**
sec
<1
Domestic water side pressure difference
kPa
See par. 5.2
CH
Nom. load upper value***
kW
6.2 – 20.8
7.9 – 26.3
8.0 – 30.3
Nom. load lower value***
kW
5.6 – 18.7
7.1 – 23.7
7.2 – 27.3
Nom. output at 80/60°C***
kW
5.4 – 17.8
6.9 – 22.8
7.1 – 26.3
Nom. output at 50/30°C***
kW
5.9 – 18.5
7.6 – 23.4
7.8 – 27.1
Max. CH water pressure
bar
3
Max. CH water temperature
°C
90
Other data
Gas consumption (G25)
m
3
/h
0.67 – 2.65
0.85 – 3.36
0.86 – 3.93
Gas consumption (G20)
m
3
/h
0.58 – 2.29
0.74 – 2.91
0.75 – 3.39
Gas consumption (G31)
m
3
/h
0.22 – 0.87
0.28 – 1.11
0.28 – 1.29
Pressure loss unit (CH)
mWk
See par. 7.4
Electrical data
Mains voltage
V
230
230
230
Safety class
IP
IP44
IP44
IP44
Absorbed power: full load
W
105
105
105
Absorbed power: standby
W
2
2
2
Installation measurements and weight
Height
mm
590
650
710
Width
mm
450
Depth
mm
240
Weight
kg
30
33
36
* For 2 minutes, the maximum value, then the base value stated in brackets.
** Time needed from beginning of draining in order to achieve a temperature increase of 40K to the hot water outlet of the device based on the
CH hot water flow.
*** The maximum CH power is set in the factory. For the set value see the parameter list (par. 7.2 ).
Also see par. 7.3 Setting CH power.