Wiring Instructions
AuraSys™ L-2 and L-2K Installation Manual
23
4.2.7
Sounder Connections
Sounder connections are shown in Figure 11. Total current drawn from the
sounder output cannot exceed 1 A.
Figure 11: Sounder (bell) Connections
4.3
Preliminary Testing
Once the control panel has been properly installed and wired:
1.
Physically check the panel to ensure that there are no shorted or open
connections.
2.
Power up the system.
All LEDs flash in sequence.
3.
Verify that all LEDs were lit.
After programming the system as explained in Chapter
5
, perform the
following preliminary tests:
1.
Perform a walk test for each of the zones.
2.
Verify that the corresponding LEDs are lit.
3.
Arm/disarm the system to verify that the system behaves according to the
programmed settings.
4.
Initiate a call to the call center or to a private phone to test
communication.