Galaxy RAID GHDX2-2430S-16U4D Installation and Hardware Reference Manual
5-6
Unpacking
the
Subsystem
SCSI cable to connect a host port to the host computer or expansion
enclosures.
8.
Power up:
Once the components have been properly installed and all
cables are properly connected, you can power up the subsystem and
configure the RAID array. (See
Section 4.1
)
2.4.1 Installation Procedure Flowchart
Figure 2-1
shows a flowchart of the installation procedure. As you complete
each step, check off the “
Done
” box on the right. Please use this flowchart
in conjunction with the instructions that follow.
Figure 2-1: Installation Procedure Flowchart
2.5 Unpacking the Subsystem
Compare the
Unpacking List
against the actual package contents to confirm
that all required materials have been received. Carefully check the items
contained in each box before proceeding with installation.
WARNING!
Do not rely on the non-definitive, summarized unpacking list shown
below--it is for reference only. A detailed Unpacking List can be found
in your product shipping package or Product CD.