STR 750 ASSEMBLY INSTRUCTIONS
The STR 750 machine is delivered flat packed and the following instructions in conjunction with
the exploded view opposite should be followed.
After removing the various parts from the packaging, identify them against the parts shown in the
figure opposite. (Report any shortages immediately).
1.
Attach item 4 to item 2 with the fixing hardware provided.
(This immediately adds stability to the machines base channel).
2.
Attach item 3 to item 2 with the fixing hardware provided.
3.
Screw item 3 onto the stud attached under item 1.
4.
Lift and place item 1 onto item 3 ensuring that the fixing holes on each side and underneath
line up with each other. Secure both these items together with the fixing hardware
provided.
5.
Attach item 5 to item 2 by carefully tipping the machine upwards at the folder blade hinge
end to gain access to the fixing hole in the machines base channel. Secure with the fixing
hardware provided, screwing it into the tapped hole in the bottom of the item.
6.
Connect the pneumatic cylinder air lines to the appropriate connections on item 6.
NOTE!
Connect the cylinder top hose to port 4 on the foot pedal and the bottom hose to
port 2.
Fully assembled STR 750 Duct Forming
Machine from flat packed.
Summary of Contents for STR 750
Page 4: ...4 ...
Page 5: ...5 SECTION NUMBER 1 MACHINE INFORMATION ...
Page 6: ...6 STR 750 EQUIPMENT BRIEF ...
Page 7: ...7 STR 750 EQUIPMENT BRIEF ...
Page 9: ...9 SECTION NUMBER 2 SAFETY INFORMATION ...
Page 16: ...16 ...
Page 17: ...17 SECTION NUMBER 3 MACHINE ASSEMBLY INSTALLATION ...
Page 18: ...18 STR 750 ASSEMBLY ...
Page 21: ...21 STR 750 INSTALLATION ...
Page 22: ...22 ...
Page 23: ...23 SECTION NUMBER 4 MACHINE FAMILIARISATION ...
Page 27: ...27 STR 750 MACHINE EQUIPMENT FAMILIARISATION STR 750 MACHINE AS VIEWED FROM THE CLEVIS END ...
Page 30: ...30 ...
Page 31: ...31 SECTION NUMBER 5 MACHINE OPERATION ...
Page 33: ...33 ...
Page 35: ...35 STR 750 MACHINE OPERATION ...
Page 36: ...36 STR 750 MACHINE OPERATION CONTINUED ...
Page 37: ...37 STR 750 MACHINE OPERATION CONTINUED ...
Page 38: ...38 STR 750 MACHINE OPERATION CONTINUED ...
Page 39: ...39 STR 750 MACHINE OPERATION CONTINUED ...
Page 40: ...40 ...
Page 41: ...41 SECTION NUMBER 6 BASIC MAINTENANCE ROUTINES ...
Page 42: ...42 STR 750 MACHINE BASIC MAINTENANCE ROUTINES ...
Page 43: ...43 SECTION NUMBER 7 BASIC FAULT FINDING ...
Page 44: ...44 ...
Page 45: ...45 SECTION NUMBER 8 MACHINE ASSEMBLY DRAWINGS PARTS LIST ...
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ...51 SECTION NUMBER 9 RECOMMENDED SPARES LISTING ...
Page 52: ......
Page 53: ......