32
STR 750 MACHINE OPERATION
PREPARATION/SETUP & OPERATION
PREPARATION
IMPORTANT!
Prior to any machine operation the following actions should be taken:
1.
Ensure that all the machine areas are clear and free from any obstructions.
2.
Ensure that all the machine guards are fitted and are in good order.
3.
Make sure that there are no liquid spills around the machine or trailing leads, that
may lead to slips, trips and falls.
4.
Wear the appropriate (PPE) personal protection equipment.
The following personal protective equipment (but not limited to) has been identified
as being required when operating the STR 750 Machine.
Appropriate protective overalls.
Safety boots with steel protective toe caps and soles.
Appropriate safety gloves for handling sheet steel etc.
Summary of Contents for STR 750
Page 4: ...4 ...
Page 5: ...5 SECTION NUMBER 1 MACHINE INFORMATION ...
Page 6: ...6 STR 750 EQUIPMENT BRIEF ...
Page 7: ...7 STR 750 EQUIPMENT BRIEF ...
Page 9: ...9 SECTION NUMBER 2 SAFETY INFORMATION ...
Page 16: ...16 ...
Page 17: ...17 SECTION NUMBER 3 MACHINE ASSEMBLY INSTALLATION ...
Page 18: ...18 STR 750 ASSEMBLY ...
Page 21: ...21 STR 750 INSTALLATION ...
Page 22: ...22 ...
Page 23: ...23 SECTION NUMBER 4 MACHINE FAMILIARISATION ...
Page 27: ...27 STR 750 MACHINE EQUIPMENT FAMILIARISATION STR 750 MACHINE AS VIEWED FROM THE CLEVIS END ...
Page 30: ...30 ...
Page 31: ...31 SECTION NUMBER 5 MACHINE OPERATION ...
Page 33: ...33 ...
Page 35: ...35 STR 750 MACHINE OPERATION ...
Page 36: ...36 STR 750 MACHINE OPERATION CONTINUED ...
Page 37: ...37 STR 750 MACHINE OPERATION CONTINUED ...
Page 38: ...38 STR 750 MACHINE OPERATION CONTINUED ...
Page 39: ...39 STR 750 MACHINE OPERATION CONTINUED ...
Page 40: ...40 ...
Page 41: ...41 SECTION NUMBER 6 BASIC MAINTENANCE ROUTINES ...
Page 42: ...42 STR 750 MACHINE BASIC MAINTENANCE ROUTINES ...
Page 43: ...43 SECTION NUMBER 7 BASIC FAULT FINDING ...
Page 44: ...44 ...
Page 45: ...45 SECTION NUMBER 8 MACHINE ASSEMBLY DRAWINGS PARTS LIST ...
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ...51 SECTION NUMBER 9 RECOMMENDED SPARES LISTING ...
Page 52: ......
Page 53: ......