PERSONAL PROTECTIVE EQUIPMENT (PPE)
The Personal Protective Equipment at Work Regulations 1992 require all employers to self
assess the health and safety risk to their employees and, where appropriate, provide them with
suitable personal protective equipment. Legislation demands that each employee be fully trained
in the use of any such PPE supplied.
The following personal protective equipment (but not limited to) has been identified as being
required when operating the STR 750 Duct Forming Machine.
1.
Appropriate protective overalls.
2.
Safety boots with steel protective toe caps and souls.
3.
Appropriate safety gloves for handling sheet steel etc.
SAFETY GUIDELINES
MECHANICAL:
1.
Read the machine manual before operating the machine.
2.
Use the machine only for its intended purpose.
3.
The machine should be installed in a cool dry area.
4.
Avoid build up of scrap, debris and off cuts etc around moving components.
5.
Do not operate the machine if any mechanical damage or wear has occurred.
6.
Do not leave inexperienced operators unsupervised.
7.
Keep hands away from moving components.
8.
Keep machine clean and in optimum working condition for efficient and safe
operation.
9.
Ensure access to the machine is clear at all times.
Summary of Contents for STR 750
Page 4: ...4 ...
Page 5: ...5 SECTION NUMBER 1 MACHINE INFORMATION ...
Page 6: ...6 STR 750 EQUIPMENT BRIEF ...
Page 7: ...7 STR 750 EQUIPMENT BRIEF ...
Page 9: ...9 SECTION NUMBER 2 SAFETY INFORMATION ...
Page 16: ...16 ...
Page 17: ...17 SECTION NUMBER 3 MACHINE ASSEMBLY INSTALLATION ...
Page 18: ...18 STR 750 ASSEMBLY ...
Page 21: ...21 STR 750 INSTALLATION ...
Page 22: ...22 ...
Page 23: ...23 SECTION NUMBER 4 MACHINE FAMILIARISATION ...
Page 27: ...27 STR 750 MACHINE EQUIPMENT FAMILIARISATION STR 750 MACHINE AS VIEWED FROM THE CLEVIS END ...
Page 30: ...30 ...
Page 31: ...31 SECTION NUMBER 5 MACHINE OPERATION ...
Page 33: ...33 ...
Page 35: ...35 STR 750 MACHINE OPERATION ...
Page 36: ...36 STR 750 MACHINE OPERATION CONTINUED ...
Page 37: ...37 STR 750 MACHINE OPERATION CONTINUED ...
Page 38: ...38 STR 750 MACHINE OPERATION CONTINUED ...
Page 39: ...39 STR 750 MACHINE OPERATION CONTINUED ...
Page 40: ...40 ...
Page 41: ...41 SECTION NUMBER 6 BASIC MAINTENANCE ROUTINES ...
Page 42: ...42 STR 750 MACHINE BASIC MAINTENANCE ROUTINES ...
Page 43: ...43 SECTION NUMBER 7 BASIC FAULT FINDING ...
Page 44: ...44 ...
Page 45: ...45 SECTION NUMBER 8 MACHINE ASSEMBLY DRAWINGS PARTS LIST ...
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ...51 SECTION NUMBER 9 RECOMMENDED SPARES LISTING ...
Page 52: ......
Page 53: ......