Fixing nut
Flexible hose 2
Flexible hose 1
Metal bracket
Rubber washer
Threaded bar
O-ring
Pop-up waste lever
INSTALLATION PROCEDURE
1.
Prior to installation flush out the pipe work to
remove debris & then ensure that the water supply
is turned off.
2.
Refer to diagram & check that all components
are present.
3.
Fit the flexible hoses to the basin mixer body
using an appropriate spanner, making sure that you
do not over tighten.
4.
Screw the shorter threaded end of both
threaded bars into their locations inside the mixer
body. The bottom of the threaded bars have a cross
head screw drive. Use a small Phillips screwdriver to
tighten the threaded bars to the mixer body.
5.
Fit the mixer body to the basin using the
supplied rubber washer, metal bracket and fixing
nuts in the order indicated in the drawing, DO NOT
over-tighten as this may damage the basin.
Remember to install base plate and the O-ring
between the mixer body & the basin.
6.
Proceed to fit the pop-up waste. See
instructions opposite.
7.
Connect the water supply to the flexible hoses.
Hot supply should always be connected to the left
hose (Flexible hose 1 in the diagram).
8.
Fully open mixer on both hot & cold sides &
allow water to run for approximately one minute to
further flush the system.
9.
Check all connections to ensure there are no
leaks.
FITTING POP-UP WASTE
Insert the handle rod through the hole on the back
of the basin mixer. Then screw the extension rod
onto the handle rod.
Fit the waste top and waste body components to
the basin ensuring that washer 1 is above the basin
and washer 2 is below.
Slide the pivot connector onto the extension rod in
the position shown in the diagram.
Remove the cover cap from the waste body and
place it behind the ball on the pivot rod. Insert the
end of the pivot rod into the cylindrical part of the
pivot connector (do not tighten the screws on the
pivot connector at this stage).
Insert the pivot rod through the side of the waste
body so it inserts through the loop on the base of
the waste plug. NOTE the position of the loop may
require adjusting. Turn anti-clockwise to extend
until it is long enough for the pivot rod to be
inserted through whilst sat inside the waste top.
Screw on the cover cap to lock the pivot rod in
position then tighten the screws on the pivot
connector.
Test the mechanism action and make adjustments
to the rod / pivot connector positions as necessary
to create a smooth action.
Handle rod
Extension rod
Waste top
Washer 1
Washer 2
Pivot connector
Cover cap
Waste body
Pivot rod
Waste plug
Base plate