9 Deforest Street, Amityville, New York, 11701 USA
www.romanoff.com
34
Monitoring Devices
close as possible to the extraction location, ideally even firmly connected to the extraction
element.
It is recommended to evaluate the volume flow monitoring separately via a PLC or other
suitable control or signalling device assigned to the process. Alternatively, the signal
module can also be used to evaluate and signal the volume flow monitoring.