![RollEase Cassette 100 Installation Instructions Manual Download Page 24](http://html.mh-extra.com/html/rollease/cassette-100/cassette-100_installation-instructions-manual_1482392024.webp)
24
Skyline & R-Series
Cassette 120 Fabrication
Step 5: Assemble Headrail and Tube
5a. Lay Cassette on table or flat surface. Insert one bracket by aligning bracket into grooves on top
of the headrail. Push bracket all the way in. (be careful not to bend bracket if using a mallet or
hammer to tap brackets in) If desired, use screws to hold brackets in place
5b. Insert clutch or idler end of tube onto the bracket. (see note for R-Series)
5c. Attach End Caps (if desired)
For Skyline, insert idler side first. Push into
bracket, and slip clutch side down until the hooks
engage in the holes in the bracket and lock into
place.
Skyline
R-Series
Gently tap bracket into
the grooves in the
headrail
Slide End Plug into
the tab of bracket
Slide hole in the middle
of the R-Series Clutch
into the tab of bracket
When fabricating R-Series, you must insert one bracket and
insert clutch or pin end, and then simultaneously insert
other bracket into the opposite end.
Lay plastic across cassette before
laying in tube with fabric. After
installing shade, tie around the top
of cassette to prevent shade from
falling during shipment to
customer.
Cassette 120
5a.
5a.
5b.
5b.