ROLEC OCPP0410 Installation & Operation Manual Download Page 28

THE 

UK’S

 LEADING MANUFACTURER OF 

EV CHARGING POINTS 

t: 01205 724773

e: [email protected]

www.rolecserv.com

Summary of Contents for OCPP0410

Page 1: ...e and Three Phase Socketed EV Chargers GPRS Ethernet Communication INSTALLATION OPERATION MANUAL MODELS SINGLE PHASE OCPP0410 1 X 3 6kW OCPP0411 1 X 7 2kW OCPP0420 2 X 3 6kW OCPP0421 2 X 7 2kW OCPP042...

Page 2: ...Three Phase Superfast OCPP0410 OCPP0412 OCPP0411 OCPP0413 OCPP0420 OCPP0422 OCPP0421 OCPP0423 OCPP0425 Document Type Installation and Operation Manual Document Code EVQROCM 01 V03 R0 Language UK Engl...

Page 3: ...allation Procedure 15 Base Installation If Supplied 15 If a Base is Not Supplied 15 Install the Pedestal 16 Commissioning 18 Commissioning with VendElectric 18 LED Illumination 18 After Installation 1...

Page 4: ...so by the manufacturer x Do NOT attempt to repair the equipment unless specifically instructed to do so by the manufacturer x To maintain electrical safety the body enclosure of the product access cov...

Page 5: ...sockets OCPP0412 Quantum EV OpenCharge OCPP 1x 11kW 16A Type 2 socket OCPP0413 Quantum EV OpenCharge OCPP 1x 22kW 32A Type 2 socket OCPP0422 Quantum EV OpenCharge OCPP 2x 11kW 16A Type 2 sockets OCPP...

Page 6: ...m Polycarbonate x Base Impact resistant 5mm Polycarbonate Mass 32 kg Operating Temperature 30 C to 50 C Operating Humidity Range 5 to 95 Figure 1 General Arrangement and Dimensions NOTE Depending on t...

Page 7: ...AC 50Hz Single Phase 2x 63A 230V AC 50Hz Single Phase Cable Terminals 3x 50 mm 2x 3x 50 mm Communications GPRS Recommended signal strength of 14 CSQ or better or RJ45 ethernet connection 2x RJ45 ethe...

Page 8: ...ection BS EN 60529 1992 A2 2013 x Enclosure IP66 x Socket IP54 BS EN62262 2008 x Enclosure IK10 impact rating Plug s Socket s BS EN 62196 1 2014 BS EN 62196 2 2017 Fire Rating UL94 Flame Rating at V2...

Page 9: ...els may be in the form of adhesive stickers plates and or moulded into the surface of components Information Labels Figure 2 Typical Product Rating Labels Figure 3 Typical Fascia Label Figure 4 RFID a...

Page 10: ...by someone who is properly qualified and competent to do so in accordance with the current legislation in force in the geographical location of the installation x Advice provided in this manual does...

Page 11: ...V N INPUT 100 240VAC 0 88A 50 60Hz L V 4 2 T1 4 T2 6 T3 14 NO A2 1 L1 3 L2 5 L3 13 NO A2 A1 SNUBBER ACEN0095 C20 1 2 O OFF ACEO0200 63A I n 0 03A 230V 240V N 1 N 2 T Test Regularly 50 60Hz Im I m 100...

Page 12: ...0VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SOCKET 1 SOCKET 2 12V 0V 4 WHITE CABLE 4 12 11 10 10 9 8 7 6 5 2 1 ACEO0200 63A I n 0 03A 230V 240V N 1 N 2 T Test Regularly 50 60Hz Im I m 1000A Inc I c 10...

Page 13: ...et Quantum EV OpenCharge Schematic EARTH IN ACCORDANCE WITH CURRENT REGULATIONS NOTE The 4x Socket Quantum is effectively two 2x socket Quantums in one pedestal enclosure With the exception of the com...

Page 14: ...3 5 N 2 4 6 LIVE 1 LIVE 2 LIVE 3 NEUTRAL EARTH A1 A2 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1 3 4 6 WHITE 1 2 3 E CP PP N L3 L2 L1 3 2 1 0V 3 2 1 1 7 6 2 4 4 SDA SCL MOSI MISO IQR GND RST 3 3V...

Page 15: ...0 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5 7 24 23 21 20 2 4 6 8 A B 1000imp kWh DTS353F 2 EN50470 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5 7 24 23 21 20 2 4 6 8 12V 0V LIV...

Page 16: ...ckage and or item damage should be provided 4 Make sure the unit model is correct and matches the order NOTE Incorrect or damaged units must NOT be installed Contact your supplier to discuss rectifica...

Page 17: ...the base and to allow entry of the power and ethernet cable if required 4 Fit the mat over the cables and onto the ground mounting base or the securing points if a base was not supplied 5 Carefully l...

Page 18: ...nsit and or installation 13 Switch ON the power to the unit and test in accordance with the current legislation applicable in the geographical region of the installation x Make sure this product has b...

Page 19: ...end of this manual 3 Once commissioning is complete the Host will receive an invitation from VendElectric to set up their Back Office 4 Engage with the customer to install the VendElectric application...

Page 20: ...to the EV Driver App User Guide included within the charger packaging Status Indicator Guide Flashing blue light Socket Available Flashing green light Socket Available for Plug and Go charging optiona...

Page 21: ...Charging cables should be routed between the charger and the vehicle so as not to cause an obstruction or trip hazard 4 Charging cables must NOT be left connected to the charger when not in use 5 Cha...

Page 22: ...r in accordance with applicable regulations for the region of use A typical maintenance inspection and testing schedule is provided on the next page This schedule alternates on a quarterly basis betwe...

Page 23: ...sical damage x All warning labels present and legible x Status Indicators operating and displaying correct status x If installed check the condition of the charging socket contacts and socket flap x I...

Page 24: ...ing a service and support agreement with your preferred Installer to ensure you are covered for all potential call out and eventualities THE FOLLOWING STEP IS ONLY REQUIRED IF YOU HAVE PURCHASED THE P...

Page 25: ...CONTACT US 4 COMPLETE As a part of its services VendElectric will routinely monitor the connectivity and health of the charging points and notify the Host s nominee of any faults or connection issues...

Page 26: ...Installers Notes Quantum EV OpenCharge EVQROCM 01 V03 R0 Installation and Operation Manual Page 25 of 25 January 2022 Installers Notes...

Page 27: ......

Page 28: ...THE UK S LEADING MANUFACTURER OF EV CHARGING POINTS t 01205 724773 e enquiries rolecserv co uk www rolecserv com...

Reviews: