ROLEC OCPP0410 Installation & Operation Manual Download Page 25

Essential

Premium

OZEV GRANT ELIGIBLE:

WCS 

(Workplace Charging Scheme)

USER ACCESS:

Plug & Play Charging
Mobile Phone App
RFID Card/Fob

HOST MANAGEMENT:

Unlimited Back-Office  

Platform Access
Chargepoint Management 

Dashboard
Visibility Of Your Entire 

Chargepoint Network
Real-Time, Historical &  

Analytical Feedback
Customisable Tariffs
Optional Revenue Stream**
Private, Public & Fleet  

Charging Options
Exportable Usage, Revenue  

& BIK 

(Benefit In Kind)

 Data

Automatic Maintenance  

Response Notifications
Electrical Load Management*** 

(Optional)

£50

per 3 Years

(each socket)

£135

per 3 Years

(each socket)

*

To onboard your Rolec charging 

points to the VendElectric system 

simply follow the following steps:

Getting Connected

For more information call 

01205 725765

  

Email 

[email protected]

 

Or visit 

vendelectric.com

3 YEAR DATA MANAGEMENT PRICING & PLANS

1. PURCHASE YOUR CHOSEN PLAN

For each project you will need to: 
 

Purchase

 your chosen 

Data  

Management Plan

 (see table opposite).

 

Pay

 any 

Remote Commissioning Fees

 

(where applicable).

2. BOOK YOUR INSTALLATION

Contact your chosen Installer to  

arrange a suitable date

 to install  

your charging points.

3. GET CONNECTED

Once installed, your contractor will 

commission and connect your charging 

points

 on to our system.

4. BACK OFFICE MANAGEMENT SUITE

Once connected to our system, you will 

receive an email invitation to connect to the 

VendElectric

 Back Office where you can also 

access easy-to-follow video walkthroughs 

of the system, enabling you to configure, 

manage and monitor your chargepoints.

IMPORTANT ADVICE

As a part of its services 

VendElectric 

will routinely monitor 

the connectivity and health of the charging points and 

notify the Host’s nominee of any faults or connection issues 

that we detect. 

Transitory issues can often be cleared 

by power-cycling and we strongly recommend that the 

Installer advises the Client how this can be done during the 

handover process.

We also recommend that you consider entering a service and 

support agreement with your preferred Installer to ensure 

you are covered for all potential call out and eventualities.

THE FOLLOWING STEP IS ONLY REQUIRED IF 

YOU HAVE PURCHASED THE 

PREMIUM PLAN 

See the VendElectric Overview for  

more information www.bit.ly/3fpkiAb

HOST’S GUIDE

PRICING EXAMPLE:

3 YEAR ESSENTIAL PLAN

UNIT TYPE

DESCRIPTION

QTY

PRICE (£)

TOTAL (£)

1way 

Charging 

Unit

Essential Plan Data Management 

Fees (per socket)

1

50.00

50.00

1way Unit GPRS SIM 

1

45.00

45.00

2way 

Charging 

Unit

Essential Plan Data Management 

Fees (per socket)

2

50.00

100.00

2way Unit GPRS SIM

1

65.00

65.00

3 YEAR PREMIUM PLAN

UNIT TYPE

DESCRIPTION

QTY

PRICE (£)

TOTAL (£)

1way 

Charging 

Unit

Premium Plan Data Management 

Fees (per socket)

1

135.00

135.00

1way Unit GPRS SIM 

1

45.00

45.00

Remote Commissioning (per unit)

1

30.00

30.00

2way 

Charging 

Unit

Premium Plan Data Management 

Fees (per socket)

2

135.00

270.00

2way Unit GPRS SIM

1

65.00

65.00

Remote Commissioning (per unit)

1

30.00

30.00

ADDITIONAL COSTS:

CONNECTIVITY

To connect a chargepoint(s) to the VENDELECTRIC 

network via GPRS a SIM card is required. The below costs 

cover the SIM card connection for a 36-month period:

•  1way OCPP unit - £45 per SIM
•  2way OCPP unit - £65 per SIM

Should you wish to have the units solely Ethernet 

connected, the SIM card costs above will not apply.

COMMISSIONING

A remote commissioning fee of £30 per unit is applicable 

on the premium data management plan. 
Commissioning is to be carried out by the client’s appointed 

installer with support from a VendElectric back-office 

representative via telephone, if required. 
DC chargepoints may require on-site commissioning***

OPTIONAL LOAD MANAGEMENT

Additional costs apply which are determined by the 

installation / site’s specific requirements.

* T

he V

en

dE

le

ct

ric E

ss

en

tia

l m

an

ag

em

en

t p

la

n p

ro

vi

de

s t

he h

os

t w

ith a

n a

ut

om

at

ed q

ua

rte

rly c

ha

rg

ep

oi

nt c

on

su

m

pt

io

n r

ep

or

t a

s r

eq

ui

re

d i

n o

rd

er t

o m

ee

t e

lig

ib

ilit

y f

or t

he O

ZE

V W

or

kp

la

ce C

ha

rg

in

g S

ch

em

e G

ra

nt (

W

CS

).

**

Al

l r

ev

en

ue w

ill b

e s

ub

je

ct t

o a 7

.5

% p

ay

m

en

t p

ro

ce

ss

in

g f

ee w

hi

ch w

ill b

e d

ed

uc

te

d f

ro

m t

he H

os

t p

rio

r t

o p

ay

m

en

t o

f t

he a

gr

ee

d p

ay

m

en

t s

ch

ed

ul

e.  *

**

Su

bj

ec

t t

o a

dd

iti

on

al c

os

ts

.

INSTALLER’S GUIDE

Ensure Client (the Host) has made 

payment for their chosen Data 

Management Plan & any Remote 

Commissioning Fees and are in possession 

of their ‘

Getting Connected

’ guide 

available at 

www.bit.ly/3nNgaPd

Install the charging point/s then use the 

VendElectric Install & Test Tool

 and 

connect to our network. 

For OCPP Chargepoints go to:

installer.ocpp.vendelectric.com

Username: 

installer

Password: 

inst.t3st

For Mode 3 Chargepoints go to:

installer.vendelectric.com

Username: 

installer

Password: 

inst.t3st

Once connected and tested call  

01205 725765

 from the installation site to 

arrange the 

Back-Office connection*

 and 

remote commissioning service.

* Back-Office connection is only included if 

the Host has opted for the Premium Data 

Managemnt Plan.

The Host will receive an email invitation to 

connect to the 

VendElectric

 Back Office 

where they can also access easy-to-

follow video walkthroughs of the system, 

enabling users to configure, manage and 

monitor their chargepoints.

1. HOST SIGN UP & PAYMENT

2. INSTALL & TEST

3. CONTACT US 

4. COMPLETE

As a part of its services 

VendElectric 

will routinely 

monitor the connectivity and health of the charging 

points and notify the Host’s nominee of any faults or 

connection issues that we detect. 

Transitory issues 

can often be cleared by power-cycling and we 

strongly recommend that you advise your Client how 

this can be done during the handover process.

Rolec equipment is covered by a parts warranty, 

however we recommend that you consider offering 

a service support agreement to your Client to ensure 

they have appropriate cover for all potential call out 

eventualities.

RECOMMENDATIONS

What we need?

  Signed and returned Data Management  

Plan Agreement.

  Payment of Remote Commissioning 

Fees 

(if applicable)

.

What we need?

 

Host Details.

 

Site Names and Locations.

 

Charging Point ID Numbers.

 

Feed Capacity to Sites and Charging 

Points 

(For load managed projects)

.

Getting Connected

What we need?

 

Confirmed Connection to our network.

  Proof of energy output from each 

charging socket.

o  Tip – If you don’t have an EV, plug something into the 3pin 

socket on your EV ChargeCheck (or similar tester) to draw 
out some energy.

For more information call 

01205 725765

  

Email 

[email protected]

 

Or visit 

vendelectric.com

Summary of Contents for OCPP0410

Page 1: ...e and Three Phase Socketed EV Chargers GPRS Ethernet Communication INSTALLATION OPERATION MANUAL MODELS SINGLE PHASE OCPP0410 1 X 3 6kW OCPP0411 1 X 7 2kW OCPP0420 2 X 3 6kW OCPP0421 2 X 7 2kW OCPP042...

Page 2: ...Three Phase Superfast OCPP0410 OCPP0412 OCPP0411 OCPP0413 OCPP0420 OCPP0422 OCPP0421 OCPP0423 OCPP0425 Document Type Installation and Operation Manual Document Code EVQROCM 01 V03 R0 Language UK Engl...

Page 3: ...allation Procedure 15 Base Installation If Supplied 15 If a Base is Not Supplied 15 Install the Pedestal 16 Commissioning 18 Commissioning with VendElectric 18 LED Illumination 18 After Installation 1...

Page 4: ...so by the manufacturer x Do NOT attempt to repair the equipment unless specifically instructed to do so by the manufacturer x To maintain electrical safety the body enclosure of the product access cov...

Page 5: ...sockets OCPP0412 Quantum EV OpenCharge OCPP 1x 11kW 16A Type 2 socket OCPP0413 Quantum EV OpenCharge OCPP 1x 22kW 32A Type 2 socket OCPP0422 Quantum EV OpenCharge OCPP 2x 11kW 16A Type 2 sockets OCPP...

Page 6: ...m Polycarbonate x Base Impact resistant 5mm Polycarbonate Mass 32 kg Operating Temperature 30 C to 50 C Operating Humidity Range 5 to 95 Figure 1 General Arrangement and Dimensions NOTE Depending on t...

Page 7: ...AC 50Hz Single Phase 2x 63A 230V AC 50Hz Single Phase Cable Terminals 3x 50 mm 2x 3x 50 mm Communications GPRS Recommended signal strength of 14 CSQ or better or RJ45 ethernet connection 2x RJ45 ethe...

Page 8: ...ection BS EN 60529 1992 A2 2013 x Enclosure IP66 x Socket IP54 BS EN62262 2008 x Enclosure IK10 impact rating Plug s Socket s BS EN 62196 1 2014 BS EN 62196 2 2017 Fire Rating UL94 Flame Rating at V2...

Page 9: ...els may be in the form of adhesive stickers plates and or moulded into the surface of components Information Labels Figure 2 Typical Product Rating Labels Figure 3 Typical Fascia Label Figure 4 RFID a...

Page 10: ...by someone who is properly qualified and competent to do so in accordance with the current legislation in force in the geographical location of the installation x Advice provided in this manual does...

Page 11: ...V N INPUT 100 240VAC 0 88A 50 60Hz L V 4 2 T1 4 T2 6 T3 14 NO A2 1 L1 3 L2 5 L3 13 NO A2 A1 SNUBBER ACEN0095 C20 1 2 O OFF ACEO0200 63A I n 0 03A 230V 240V N 1 N 2 T Test Regularly 50 60Hz Im I m 100...

Page 12: ...0VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SOCKET 1 SOCKET 2 12V 0V 4 WHITE CABLE 4 12 11 10 10 9 8 7 6 5 2 1 ACEO0200 63A I n 0 03A 230V 240V N 1 N 2 T Test Regularly 50 60Hz Im I m 1000A Inc I c 10...

Page 13: ...et Quantum EV OpenCharge Schematic EARTH IN ACCORDANCE WITH CURRENT REGULATIONS NOTE The 4x Socket Quantum is effectively two 2x socket Quantums in one pedestal enclosure With the exception of the com...

Page 14: ...3 5 N 2 4 6 LIVE 1 LIVE 2 LIVE 3 NEUTRAL EARTH A1 A2 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1 3 4 6 WHITE 1 2 3 E CP PP N L3 L2 L1 3 2 1 0V 3 2 1 1 7 6 2 4 4 SDA SCL MOSI MISO IQR GND RST 3 3V...

Page 15: ...0 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5 7 24 23 21 20 2 4 6 8 A B 1000imp kWh DTS353F 2 EN50470 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5 7 24 23 21 20 2 4 6 8 12V 0V LIV...

Page 16: ...ckage and or item damage should be provided 4 Make sure the unit model is correct and matches the order NOTE Incorrect or damaged units must NOT be installed Contact your supplier to discuss rectifica...

Page 17: ...the base and to allow entry of the power and ethernet cable if required 4 Fit the mat over the cables and onto the ground mounting base or the securing points if a base was not supplied 5 Carefully l...

Page 18: ...nsit and or installation 13 Switch ON the power to the unit and test in accordance with the current legislation applicable in the geographical region of the installation x Make sure this product has b...

Page 19: ...end of this manual 3 Once commissioning is complete the Host will receive an invitation from VendElectric to set up their Back Office 4 Engage with the customer to install the VendElectric application...

Page 20: ...to the EV Driver App User Guide included within the charger packaging Status Indicator Guide Flashing blue light Socket Available Flashing green light Socket Available for Plug and Go charging optiona...

Page 21: ...Charging cables should be routed between the charger and the vehicle so as not to cause an obstruction or trip hazard 4 Charging cables must NOT be left connected to the charger when not in use 5 Cha...

Page 22: ...r in accordance with applicable regulations for the region of use A typical maintenance inspection and testing schedule is provided on the next page This schedule alternates on a quarterly basis betwe...

Page 23: ...sical damage x All warning labels present and legible x Status Indicators operating and displaying correct status x If installed check the condition of the charging socket contacts and socket flap x I...

Page 24: ...ing a service and support agreement with your preferred Installer to ensure you are covered for all potential call out and eventualities THE FOLLOWING STEP IS ONLY REQUIRED IF YOU HAVE PURCHASED THE P...

Page 25: ...CONTACT US 4 COMPLETE As a part of its services VendElectric will routinely monitor the connectivity and health of the charging points and notify the Host s nominee of any faults or connection issues...

Page 26: ...Installers Notes Quantum EV OpenCharge EVQROCM 01 V03 R0 Installation and Operation Manual Page 25 of 25 January 2022 Installers Notes...

Page 27: ......

Page 28: ...THE UK S LEADING MANUFACTURER OF EV CHARGING POINTS t 01205 724773 e enquiries rolecserv co uk www rolecserv com...

Reviews: