
INSTALLER’S GUIDE
Ensure Client (the Host) has made
payment for their chosen Data
Management Plan & any Remote
Commissioning Fees and are in possession
of their ‘
Getting Connected
’ guide
downloaded at
vendelectric.com/host
Install the charging point/s then use the
VendElectric Install & Test Tool
and
connect to our network.
For OCPP Chargepoints go to:
installer.ocpp.vendelectric.com
Username:
installer
Password:
inst.t3st
For Mode 3 Chargepoints go to:
installer.vendelectric.com
Username:
installer
Password:
inst.t3st
Once connected and tested call
01205 725765
from the installation site to
arrange the
Back-Office connection*
and
remote commissioning service.
* Back-Office connection is only included if
the Host has opted for the Premium Data
Managemnt Plan.
The Host will receive an email invitation to
connect to the
VendElectric
Back Office
where they can also access easy-to-
follow video walkthroughs of the system,
enabling users to configure, manage and
monitor their chargepoints.
1. HOST SIGN UP & PAYMENT
2. INSTALL & TEST
3. CONTACT US
4. COMPLETE
For more information call
01205 725765
Or visit
vendelectric.com
As a part of its services
VendElectric
will routinely
monitor the connectivity and health of the charging
points and notify the Host’s nominee of any faults or
connection issues that we detect.
Transitory issues
can often be cleared by power-cycling and we
strongly recommend that you advise your Client how
this can be done during the handover process.
Rolec equipment is covered by a parts warranty,
however we recommend that you consider offering
a service support agreement to your Client to ensure
they have appropriate cover for all potential call out
eventualities.
RECOMMENDATIONS
What we need?
Signed and returned Data Management
Plan Agreement.
Payment of Remote Commissioning
Fees
(if applicable)
.
What we need?
Host Details.
Site Names and Locations.
Charging Point ID Numbers.
Feed Capacity to Sites and Charging
Points
(For load managed projects)
.
Getting Connected
What we need?
Confirmed Connection to our network.
Proof of energy output from each
charging socket.
o Tip – If you don’t have an EV, plug something into the 3pin
socket on your EV ChargeCheck (or similar tester) to draw
out some energy.
Summary of Contents for OCPP0010
Page 23: ......