ROLEC OCPP0010 Installation & Operation Manual Download Page 22

INSTALLER’S GUIDE

Ensure Client (the Host) has made 

payment for their chosen Data 

Management Plan & any Remote 

Commissioning Fees and are in possession 

of their ‘

Getting Connected

’ guide 

downloaded at 

vendelectric.com/host

Install the charging point/s then use the 

VendElectric Install & Test Tool

 and 

connect to our network. 

For OCPP Chargepoints go to:

installer.ocpp.vendelectric.com

Username: 

installer

Password: 

inst.t3st

For Mode 3 Chargepoints go to:

installer.vendelectric.com

Username: 

installer

Password: 

inst.t3st

Once connected and tested call  

01205 725765

 from the installation site to 

arrange the 

Back-Office connection*

 and 

remote commissioning service.

* Back-Office connection is only included if 

the Host has opted for the Premium Data 

Managemnt Plan.

The Host will receive an email invitation to 

connect to the 

VendElectric

 Back Office 

where they can also access easy-to-

follow video walkthroughs of the system, 

enabling users to configure, manage and 

monitor their chargepoints.

1. HOST SIGN UP & PAYMENT

2. INSTALL & TEST

3. CONTACT US 

4. COMPLETE

For more information call 

01205 725765

  

Email 

[email protected]

 

Or visit 

vendelectric.com

As a part of its services 

VendElectric 

will routinely 

monitor the connectivity and health of the charging 

points and notify the Host’s nominee of any faults or 

connection issues that we detect. 

Transitory issues 

can often be cleared by power-cycling and we 

strongly recommend that you advise your Client how 

this can be done during the handover process.

Rolec equipment is covered by a parts warranty, 

however we recommend that you consider offering 

a service support agreement to your Client to ensure 

they have appropriate cover for all potential call out 

eventualities.

RECOMMENDATIONS

What we need?

  Signed and returned Data Management  

Plan Agreement.

  Payment of Remote Commissioning 

Fees 

(if applicable)

.

What we need?

 

Host Details.

 

Site Names and Locations.

 

Charging Point ID Numbers.

 

Feed Capacity to Sites and Charging 

Points 

(For load managed projects)

.

Getting Connected

What we need?

 

Confirmed Connection to our network.

  Proof of energy output from each 

charging socket.

o  Tip – If you don’t have an EV, plug something into the 3pin 

socket on your EV ChargeCheck (or similar tester) to draw 
out some energy.

Summary of Contents for OCPP0010

Page 1: ...AUTOCHARGE EV EV OPENCHARGE GPRS Ethernet Communication INSTALLATION OPERATION MANUAL MODELS SINGLE PHASE OCPP0010 1 X 3 6kW OCPP0011 1 X 7 2kW OCPP0020 2 X 3 6kW OCPP0021 2 X 7 2kW 3 PHASE OCPP0012 1...

Page 2: ...hase OCPP0010 OCPP0011 OCPP0020 OCPP0021 Three Phase Superfast OCPP0012 OCPP0013 OCPP0022 OCPP0023 Document Type Installation and Operation Manual Document Code EVACOCM 01 V02 R3 Language UK English O...

Page 3: ...nstallation 9 Base Installation If Supplied 9 If a Base is Not Supplied 10 Schematics 10 Install the Charger 14 Commissioning 15 Commissioning with VendElectric 15 After Installation 15 Operation 16 V...

Page 4: ...do so by the manufacturer x Do NOT attempt to repair the equipment unless specifically instructed to do so by the manufacturer x To maintain electrical safety the body enclosure of the product access...

Page 5: ...ge OCPP Superfast 1x 11kW 16A Type 2 socket OCPP0013 AutoCharge EV OpenCharge OCPP Superfast 1x 22kW 32A Type 2 socket OCPP0022 AutoCharge EV OpenCharge OCPP Superfast 2x 11kW 16A Type 2 sockets OCPP0...

Page 6: ...mensions 1275 x 323 x 270 mm HxWxD Material Steel Enclosure Mass 24 5kg Operating Temperature 30 C to 50 C Operating Humidity Range 5 to 95 Figure 1 General Arrangement and Dimensions 2 socket model s...

Page 7: ...0Hz Single Phase Cable Terminals 3x 50mm Single Phase Communications GPRS Requires a signal strength of 14 CSQ or better or Requires an RJ45 ethernet cable Operating Temperature 30 C 50 C Product Code...

Page 8: ...n x Enclosure IP54 Socket IP54 BS EN 60529 1992 A2 2013 x Enclosure IK10 BS EN 62262 Plug s Socket s x BS EN 62196 1 2014 BS EN 62196 2 2017 Fire Rating x UL94 Flame Rating at V2 for 1 5mm and 3 0mm R...

Page 9: ...nt enclosure Labels may be in the form of adhesive stickers plates and or moulded into the surface of components Information Labels Figure 2 Typical Product Rating Label Figure 3 Typical Fascia Label...

Page 10: ...arger and any accessories have not been damaged in transit NOTE Items damaged in transit must first be reported to the courier and then to the supplier Where possible photographic evidence of package...

Page 11: ...Single Socket AutoCharge EV OpenCharge Schematic ACEN0095 C20 1 2 O OFF ACEQ0040 C6 2 N N 1 N N T A2 A1 14 11 12 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1 3 4 6 WHITE 1 2 3 14 11 25 E CP PP N L3...

Page 12: ...NG CONTROLLER RHS VIEW GREENFLUX SMART CHARGING CONTROLLER LHS VIEW 2 1 10 8 13 8V Max 2A Max 24Watt OUTPUT 12V 2A E CP PP N L3 L2 L1 V N INPUT 100 240VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SOCKET...

Page 13: ...50Hz 1 3 5 7 24 23 21 20 2 4 6 8 ACEQ0040 C6 2 N N 1 N N T ACEO0240 63A 30mA 400 415V 50 60 Hz N 1 3 5 N 2 4 6 LIVE 1 LIVE 2 LIVE 3 NEUTRAL EARTH A1 A2 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1...

Page 14: ...12V 2A E CP PP N L3 L2 L1 V N INPUT 100 240VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SNUBBER SOCKET 1 SOCKET 2 A B 1000imp kWh DTS353F 2 EN50470 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5...

Page 15: ...tallation IMPORTANT NOTE It is the responsibility of the installing engineer to satisfy themselves that all cable terminations throughout this product are secure and tight and have not become loose st...

Page 16: ...reliminary tasks listed in the Host s Guide shown at the end of this manual must have been performed by the customer Host before commissioning can proceed 2 To complete commissioning refer to the Inst...

Page 17: ...r to the EV Driver App User Guide included within the charger packaging Status Indicator Guide Flashing blue light Socket Available Flashing green light Socket Available for Plug and Go charging optio...

Page 18: ...ions 3 Charging cables should be routed between the charger and the vehicle so as not to cause an obstruction or trip hazard 4 Charging cables must NOT be left connected to the charger when not in use...

Page 19: ...eer in accordance with applicable regulations for the region of use A typical maintenance inspection and testing schedule is provided on the next page This schedule alternates on a quarterly basis bet...

Page 20: ...sical damage x All warning labels present and legible x Status Indicators operating and displaying correct status x If installed check the condition of the charging socket contacts and socket flap x I...

Page 21: ...vises the Client how this can be done during the handover process We also recommend that you consider entering a service and support agreement with your preferred Installer to ensure you are covered f...

Page 22: ...3 CONTACT US 4 COMPLETE For more information call 01205 725765 Email support vendelectric com Or visit vendelectric com As a part of its services VendElectric will routinely monitor the connectivity a...