Install the Charger

1. Release and remove the access panel using the supplied key. 
2. Carefully lift the pedestal then lower it to fit the power cable (and ethernet cable if 

required) through the rubber mat and into the chassis. Fully lower the chassis onto 

either:

x

the ground mounting base (align the four holes in the chassis with the four studs 

of the base).

x

the prepared surface.

3. Route the cable(s) to the appropriate length to be able to connect to the 

terminals.

4. Secure the chassis to the ground with the appropriate fasteners for the location.
5. Trim around the pedestal base to remove any excess rubber from the splash mat (if 

required).

6. Terminate the power supply cable in the appropriate manner and connect to the 

pedestal as per the appropriate model number schematic.

7. If required, connect the Ethernet cable to the Communications unit.
8. Make sure all cable connections are secure and have not become loose or 

damaged in transit or during installation.

IMPORTANT NOTE: 

It is the responsibility of the installing engineer to satisfy themselves, that all cable 

terminations throughout this product are secure and tight and have not become 

loose, strained, or disconnected during transit and/or installation.

9. Make sure ALL debris is removed from the enclosure and that no debris is present 

on any of the components.

10. Switch ON the switchgear for the power.
11. Switch ON the power to the unit and test in accordance with the current Electrical 

Wiring Regulations.

x

Make sure this product, and switchgear have been installed in compliance 

with the current Electrical Wiring Regulations (including recommended 

earthing arrangements).

12. Make sure you are satisfied that the installation is complete and is in a safe 

condition.

13. Refit and secure the access panel, taking care not to trap any electrical cables. 

NOTE: 

All electrical work must be performed in accordance with the current Electrical 

Wiring Regulations.

CAUTION: Equipment Damage – Sensitive Equipment

If you will be performing insulation resistance tests on the power supply cables, it is 

advised to be done BEFORE connecting the cable to the charger. The high voltages 

applied during the test may damage sensitive components if tested after the cable is 

connected.

Installation

AutoCharge:EV OpenCharge

EVACOCM-01-V02-R3 Installation and Operation Manual

Page 

13

of 

21

December 2021

Applicable to three-phase, single socket units:

x

OCPP0022

x

OCPP0023

Figure 11 Three Phase, Double Socket AutoCharge:EV OpenCharge – Schematic

D

20

400V

6000

IE

C60898

AC

EN

0098

I

O

D

20

400V

6000

IE

C60898

AC

EN

0098

I

O

16
15

13

NE

CP

PP

L1

L2

L3

12

24

11

23

10

22

9

21

8

20

7

19

6

18

5

17

42
31

14

Re

la

is Contr

ol

(1

)

(2

)

Soc

ke

t C

ont
rol

 (2

)

Soc

ke

t C

ont
rol

 (1

)

Card

read
er(

1)
Card

read
er(

2)

12

24

1

13

n

p

-+

rs

485 /

 p

ow

er

SI

M

G

PRS

LAN

st

at

us

GREENFLUX

 SM
ART

CHA

RGI
NG CONT

ROLLER

(FRONT

 VI

EW
)

A2

A1

14

11

12

LIVE 1

INCOM

ING SUPPLY

3

GREENFLUX

 SM
ART

CHA

RGI
NG CONT

ROLLER

(RHS VI

EW
)

GREENFLUX

 SM
ART

 CHA

RGI
NG

CONT

ROLLER (LHS VI

EW
)

2

1

SNUBBER

10.

8-

13.

8V

 M

ax.

2A

 M

ax.

24W

at

t

O

UT

PU

T: 12V
-2A

E

CP

PP

N

L3

L2

L1

+V

N

IN

PU

T: 100-
240V

AC

0.

88A
    50/

60H
z

A1

L

-V

11

A2

12

14

3

2

1

SNUBBER

SO
C

K

ET

 1

SO
C

K

ET

 2

AB

1000im

p/

kW

h

DT

S3

53

F-2

EN

50470-

1/

3

kWh

-25°
C

 to 55°

C

3X

230/
400V

0,

25-
5(

80)
A

50H
z

1

35

7

24

23

21

20

2

468

AB

1000im

p/

kW

h

DT

S3

53

F-2

EN

50470-

1/

3

kWh

-25°
C

 to 55°

C

3X

230/
400V

0,

25-
5(

80)
A

50H
z

1

35

7

24

23

21

20

2468

12V

0V

LIVE 2

LIVE 3

NEUTRAL

EARTH

AC

EQ

0040

C6

2

N

N1

N

N

T

4

4 -

 W

H

IT

E C
ABL
E

4

AC

EO

0240

63A

30m
A

400/
415V

50/

60/

H

z

N1

3

5

N2

4

6

AC

EO

0240

63A

30m
A

400/
415V

50/

60/

H

z

N1

3

5

N2

4

6

12

11

10

10

9

8

7

6

5

2

1

SD

A
SC

L

M

OS
IM

IS

O

IQR

GN
D

R

ST

3.3

V

A1

A2

ACS
E0320

A1

135

7(

13)

246

8(

14)

A2

A1
1

3

5

7(

13)

4

2

6

8(

14)

A2

240V

~

Ie(

AC

-7a)

U

e:

400V

AC
-7

a

AC
-7

b

IE

C

/E

N

 61095

IE

C

/E

N

 60947-

4-

1

20A

U

i:500V

16kW

/3~

400V

4kW
/3~

400V

ACS
E0320

A1

135

7(

13)

246

8(

14)

A2

A1
1

3

5

7(

13)

4

2

6

8(

14)

A2

240V

~

Ie(

AC

-7a)

U

e:

400V

AC
-7

a

AC
-7

b

IE

C

/E

N

 61095

IE

C

/E

N

 60947-

4-

1

20A

U

i:500V

16kW

/3~

400V

4kW
/3~

400V

A1

A2

EARTH IN 

ACCORDANCE 

WITH CURRENT 

REGULATIONS

Summary of Contents for OCPP0010

Page 1: ...AUTOCHARGE EV EV OPENCHARGE GPRS Ethernet Communication INSTALLATION OPERATION MANUAL MODELS SINGLE PHASE OCPP0010 1 X 3 6kW OCPP0011 1 X 7 2kW OCPP0020 2 X 3 6kW OCPP0021 2 X 7 2kW 3 PHASE OCPP0012 1...

Page 2: ...hase OCPP0010 OCPP0011 OCPP0020 OCPP0021 Three Phase Superfast OCPP0012 OCPP0013 OCPP0022 OCPP0023 Document Type Installation and Operation Manual Document Code EVACOCM 01 V02 R3 Language UK English O...

Page 3: ...nstallation 9 Base Installation If Supplied 9 If a Base is Not Supplied 10 Schematics 10 Install the Charger 14 Commissioning 15 Commissioning with VendElectric 15 After Installation 15 Operation 16 V...

Page 4: ...do so by the manufacturer x Do NOT attempt to repair the equipment unless specifically instructed to do so by the manufacturer x To maintain electrical safety the body enclosure of the product access...

Page 5: ...ge OCPP Superfast 1x 11kW 16A Type 2 socket OCPP0013 AutoCharge EV OpenCharge OCPP Superfast 1x 22kW 32A Type 2 socket OCPP0022 AutoCharge EV OpenCharge OCPP Superfast 2x 11kW 16A Type 2 sockets OCPP0...

Page 6: ...mensions 1275 x 323 x 270 mm HxWxD Material Steel Enclosure Mass 24 5kg Operating Temperature 30 C to 50 C Operating Humidity Range 5 to 95 Figure 1 General Arrangement and Dimensions 2 socket model s...

Page 7: ...0Hz Single Phase Cable Terminals 3x 50mm Single Phase Communications GPRS Requires a signal strength of 14 CSQ or better or Requires an RJ45 ethernet cable Operating Temperature 30 C 50 C Product Code...

Page 8: ...n x Enclosure IP54 Socket IP54 BS EN 60529 1992 A2 2013 x Enclosure IK10 BS EN 62262 Plug s Socket s x BS EN 62196 1 2014 BS EN 62196 2 2017 Fire Rating x UL94 Flame Rating at V2 for 1 5mm and 3 0mm R...

Page 9: ...nt enclosure Labels may be in the form of adhesive stickers plates and or moulded into the surface of components Information Labels Figure 2 Typical Product Rating Label Figure 3 Typical Fascia Label...

Page 10: ...arger and any accessories have not been damaged in transit NOTE Items damaged in transit must first be reported to the courier and then to the supplier Where possible photographic evidence of package...

Page 11: ...Single Socket AutoCharge EV OpenCharge Schematic ACEN0095 C20 1 2 O OFF ACEQ0040 C6 2 N N 1 N N T A2 A1 14 11 12 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1 3 4 6 WHITE 1 2 3 14 11 25 E CP PP N L3...

Page 12: ...NG CONTROLLER RHS VIEW GREENFLUX SMART CHARGING CONTROLLER LHS VIEW 2 1 10 8 13 8V Max 2A Max 24Watt OUTPUT 12V 2A E CP PP N L3 L2 L1 V N INPUT 100 240VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SOCKET...

Page 13: ...50Hz 1 3 5 7 24 23 21 20 2 4 6 8 ACEQ0040 C6 2 N N 1 N N T ACEO0240 63A 30mA 400 415V 50 60 Hz N 1 3 5 N 2 4 6 LIVE 1 LIVE 2 LIVE 3 NEUTRAL EARTH A1 A2 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1...

Page 14: ...12V 2A E CP PP N L3 L2 L1 V N INPUT 100 240VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SNUBBER SOCKET 1 SOCKET 2 A B 1000imp kWh DTS353F 2 EN50470 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5...

Page 15: ...tallation IMPORTANT NOTE It is the responsibility of the installing engineer to satisfy themselves that all cable terminations throughout this product are secure and tight and have not become loose st...

Page 16: ...reliminary tasks listed in the Host s Guide shown at the end of this manual must have been performed by the customer Host before commissioning can proceed 2 To complete commissioning refer to the Inst...

Page 17: ...r to the EV Driver App User Guide included within the charger packaging Status Indicator Guide Flashing blue light Socket Available Flashing green light Socket Available for Plug and Go charging optio...

Page 18: ...ions 3 Charging cables should be routed between the charger and the vehicle so as not to cause an obstruction or trip hazard 4 Charging cables must NOT be left connected to the charger when not in use...

Page 19: ...eer in accordance with applicable regulations for the region of use A typical maintenance inspection and testing schedule is provided on the next page This schedule alternates on a quarterly basis bet...

Page 20: ...sical damage x All warning labels present and legible x Status Indicators operating and displaying correct status x If installed check the condition of the charging socket contacts and socket flap x I...

Page 21: ...vises the Client how this can be done during the handover process We also recommend that you consider entering a service and support agreement with your preferred Installer to ensure you are covered f...

Page 22: ...3 CONTACT US 4 COMPLETE For more information call 01205 725765 Email support vendelectric com Or visit vendelectric com As a part of its services VendElectric will routinely monitor the connectivity a...

Page 23: ......

Page 24: ...THE UK S LEADING MANUFACTURER OF EV CHARGING POINTS t 01205 724773 e enquiries rolecserv co uk www rolecserv com...

Reviews: