Installation
EVACOCM-01-V02-R3 Installation and Operation Manual
AutoCharge:EV OpenCharge
December 2021
Page
14
of
21
Install the Charger
1. Release and remove the access panel using the supplied key.
2. Carefully lift the pedestal then lower it to fit the power cable (and ethernet cable if
required) through the rubber mat and into the chassis. Fully lower the chassis onto
either:
x
the ground mounting base (align the four holes in the chassis with the four studs
of the base).
x
the prepared surface.
3. Route the cable(s) to the appropriate length to be able to connect to the
terminals.
4. Secure the chassis to the ground with the appropriate fasteners for the location.
5. Trim around the pedestal base to remove any excess rubber from the splash mat (if
required).
6. Terminate the power supply cable in the appropriate manner and connect to the
pedestal as per the appropriate model number schematic.
7. If required, connect the Ethernet cable to the Communications unit.
8. Make sure all cable connections are secure and have not become loose or
damaged in transit or during installation.
IMPORTANT NOTE:
It is the responsibility of the installing engineer to satisfy themselves, that all cable
terminations throughout this product are secure and tight and have not become
loose, strained, or disconnected during transit and/or installation.
9. Make sure ALL debris is removed from the enclosure and that no debris is present
on any of the components.
10. Switch ON the switchgear for the power.
11. Switch ON the power to the unit and test in accordance with the current Electrical
Wiring Regulations.
x
Make sure this product, and switchgear have been installed in compliance
with the current Electrical Wiring Regulations (including recommended
earthing arrangements).
12. Make sure you are satisfied that the installation is complete and is in a safe
condition.
13. Refit and secure the access panel, taking care not to trap any electrical cables.
NOTE:
All electrical work must be performed in accordance with the current Electrical
Wiring Regulations.
CAUTION: Equipment Damage – Sensitive Equipment
If you will be performing insulation resistance tests on the power supply cables, it is
advised to be done BEFORE connecting the cable to the charger. The high voltages
applied during the test may damage sensitive components if tested after the cable is
connected.
Installation
AutoCharge:EV OpenCharge
EVACOCM-01-V02-R3 Installation and Operation Manual
Page
13
of
21
December 2021
Applicable to three-phase, single socket units:
x
OCPP0022
x
OCPP0023
Figure 11 Three Phase, Double Socket AutoCharge:EV OpenCharge – Schematic
D
20
400V
6000
IE
C60898
AC
EN
0098
I
O
D
20
400V
6000
IE
C60898
AC
EN
0098
I
O
16
15
13
NE
CP
PP
L1
L2
L3
12
24
11
23
10
22
9
21
8
20
7
19
6
18
5
17
42
31
14
Re
la
is Contr
ol
(1
)
(2
)
Soc
ke
t C
ont
rol
(2
)
Soc
ke
t C
ont
rol
(1
)
Card
read
er(
1)
Card
read
er(
2)
12
24
1
13
n
p
-+
rs
485 /
p
ow
er
SI
M
G
PRS
LAN
st
at
us
GREENFLUX
SM
ART
CHA
RGI
NG CONT
ROLLER
(FRONT
VI
EW
)
A2
A1
14
11
12
LIVE 1
INCOM
ING SUPPLY
3
GREENFLUX
SM
ART
CHA
RGI
NG CONT
ROLLER
(RHS VI
EW
)
GREENFLUX
SM
ART
CHA
RGI
NG
CONT
ROLLER (LHS VI
EW
)
2
1
SNUBBER
10.
8-
13.
8V
M
ax.
2A
M
ax.
24W
at
t
O
UT
PU
T: 12V
-2A
E
CP
PP
N
L3
L2
L1
+V
N
IN
PU
T: 100-
240V
AC
0.
88A
50/
60H
z
A1
L
-V
11
A2
12
14
3
2
1
SNUBBER
SO
C
K
ET
1
SO
C
K
ET
2
AB
1000im
p/
kW
h
DT
S3
53
F-2
EN
50470-
1/
3
kWh
-25°
C
to 55°
C
3X
230/
400V
0,
25-
5(
80)
A
50H
z
1
35
7
24
23
21
20
2
468
AB
1000im
p/
kW
h
DT
S3
53
F-2
EN
50470-
1/
3
kWh
-25°
C
to 55°
C
3X
230/
400V
0,
25-
5(
80)
A
50H
z
1
35
7
24
23
21
20
2468
12V
0V
LIVE 2
LIVE 3
NEUTRAL
EARTH
AC
EQ
0040
C6
2
N
N1
N
N
T
4
4 -
W
H
IT
E C
ABL
E
4
AC
EO
0240
63A
30m
A
400/
415V
50/
60/
H
z
N1
3
5
N2
4
6
AC
EO
0240
63A
30m
A
400/
415V
50/
60/
H
z
N1
3
5
N2
4
6
12
11
10
10
9
8
7
6
5
2
1
SD
A
SC
L
M
OS
IM
IS
O
IQR
GN
D
R
ST
3.3
V
A1
A2
ACS
E0320
A1
135
7(
13)
246
8(
14)
A2
A1
1
3
5
7(
13)
4
2
6
8(
14)
A2
240V
~
Ie(
AC
-7a)
U
e:
400V
AC
-7
a
AC
-7
b
IE
C
/E
N
61095
IE
C
/E
N
60947-
4-
1
20A
U
i:500V
16kW
/3~
400V
4kW
/3~
400V
ACS
E0320
A1
135
7(
13)
246
8(
14)
A2
A1
1
3
5
7(
13)
4
2
6
8(
14)
A2
240V
~
Ie(
AC
-7a)
U
e:
400V
AC
-7
a
AC
-7
b
IE
C
/E
N
61095
IE
C
/E
N
60947-
4-
1
20A
U
i:500V
16kW
/3~
400V
4kW
/3~
400V
A1
A2
EARTH IN
ACCORDANCE
WITH CURRENT
REGULATIONS
Summary of Contents for OCPP0010
Page 23: ......