System configuration
R&S
®
SMBVB-K362, R&S
®
SMW-K362
13
User Manual 1178.9126.02 ─ 04
Your test plan is now assigned to your DUT.
6. Always start your tests from the tab "DUTs" by double-clicking a test plan assigned
to your DUT. It guarantees, that the test plan executes the vendor-specific com-
mands of your DUT. Otherwise, the test plan is aborted with the error, "DUT type
not found".
Preparation of IVS connection