background image

EN

8 TECHNICAL CHARACTERISTICS

BI/008

BI/008/115

POWER SUPPLY

230 Vac - 50 Hz  ±10%

115 Vac  60 Hz  ±10%

MOTOR POWER SUPPLY

0 ÷ 36 Vdc

0 ÷ 36 Vdc

POWER CONSUMPTION

0 ÷ 18 A

0 ÷ 18 A

POWER MOTOR

300 W

300 W

TORQUE

10 ÷ 400 Nm

10 ÷ 400 Nm

OPEN / CLOSE TIME 90 °

9 ÷ 29 sec

9 ÷ 29 sec

CONTROL SYSTEM

ABSOLUTE DIGITAL 

ENCODER

ABSOLUTE DIGITAL 

ENCODER

USE FREQUENCY

VERY HEAVY DUTY

VERY HEAVY DUTY

OPERATING CYCLES PER DAY  (OPENING/CLOSING - 24 
HOURS NO STOP) 

2500

2500

GRADE OF PROTECTION

IP54

IP54

OPERATING TEMPERATURE

-20°C   

+55°C

-20°C   

+55°C

CONTROL UNIT (INTEGRATED) 36 Vdc

CTRL

CTRL

ACCESSORIES POWER SUPPLY

24 Vdc

24 Vdc

BOOM

up to 8 m

up to 8 m

EMERGENCY BATTERY 

AVAILABLE 

(OPTIONAL)

AVAILABLE 

(OPTIONAL)

RELEASE SYSTEM

KEY WITH DIN CYLINDER

KEY WITH DIN CYLINDER

9 TYPICAL INSTALLATION

1

Automatic Barrier BIONIK

2

Integrated control unit

3

Flashing lights

4

External Photocell

5

Boom with shockproof rubber

6

Strip led

7

Reflective sticker

8

Internal Photocell

9

Boom’s Fixed support for boom.

10

Release system 

11

Key or keypad release switch

11

4 1

2

3

5

6

7

4

9 8

10 8

Summary of Contents for BI/008

Page 1: ...autom tica Brushless Barreira autom tica Brushless IT Manuale di installazione EN Instruction and warnings for the installer DE Anleitungen und Hinweise f r den Installateur FR Instructions et averti...

Page 2: ...operation are tted Display the signs required by law to identify hazardous areas Each installation must bear a visible indication of the data identifying the motorised door or gate An omnipolar discon...

Page 3: ...up to 8 metres with on board control unit digital absolute encoder complete with xing base with tie rods and screws and boom xing ange For line voltages of 115V 6 STANDARD DIMENSIONS 492 900 1237 427...

Page 4: ...STOP 2500 2500 GRADE OF PROTECTION IP54 IP54 OPERATING TEMPERATURE 20 C 55 C 20 C 55 C CONTROL UNIT INTEGRATED 36 Vdc CTRL CTRL ACCESSORIES POWER SUPPLY 24 Vdc 24 Vdc BOOM up to 8 m up to 8 m EMERGEN...

Page 5: ...dation plate for securing the barrier 15 BAFS 01 Fixed support with rubber NOT adjustable 10 REFERENCES AND ACCESSORIES Code Description 16 BAFS 03 Fixed support with rubber NOT adjustable with provis...

Page 6: ...n the overall dimensions of the installation The installer is responsible for determining the most suitable solution Excavate a foundation pit measuring 1 5 m x 1 m x 0 5 m and ll with concrete reinfo...

Page 7: ...from the anchors on the base plate g 3 Open the inspection hatch turning the key clockwise by 90 g 4 Remove the inspection hatch g 5 Place the cabinet on the plate The anchors on the base plate must t...

Page 8: ...tions could be hazardous for the installer For LEFT hand installations 1 Unlock the barrier see chapter 23 2 Turn the linkage lever as shown in g 8 3 Move the mechanical stop see chapter 14 4 Lock the...

Page 9: ...aration g 9 Remove the plug Q1 and the end ange R1 These two parts will NOT be used again Remove the led cover N1 and shorten it by 285 mm from the side where it is fastened to the boom support Remove...

Page 10: ...to the connector M2 with the 10 self drilling screws L included 5 above and 5 under along the boom axis at a distance of 60 mm apart g 13 8 Insert the nishing collar I on the boom 9 Insert the boom i...

Page 11: ...rstood as complete with shock resistant rubber and LED strips The adjustable xed end rest with integrated magnet BAFS 05 must be used The adjustable xed end rest with integrated magnet BAFS 05 must be...

Page 12: ...ost appropriate slider CU for a correct balancing of the boom 13 2 Slider selection The correct position of the slider is determined by the boom weight the heavier the boom is weight determined by the...

Page 13: ...ries installed the more to the outside the springs should be installed hole A 4 Check the correct operation of the balancing system Lift the boom manually to an angle of 45 and let go If the boom rise...

Page 14: ...ss bar B the spring tensioning increases vice versa by moving it downward the tensioning decreases 3 Lift the boom manually to an angle of 45 and let go If the boom rises reduce the spring tension If...

Page 15: ...cheon plate B of the lock release system prising the lateral clips open to detach Undo the two self tapping screws C and remove the aluminium front panel D Undo the four M5 nuts E Push the steel conne...

Page 16: ...e photocell housing from the inside Fasten the G90 F4ES photocells to the barrier Route the connector cables upwards taking care not to interfere with the movements of the automation system and push t...

Page 17: ...t 50 mm of the connector cable conduit must protrude from the holes in the base plate and into the automation unit Ensure that there are no sharp edges which could damage the power cable 24 25 A B C D...

Page 18: ...ower supplies if applicable 2 Unscrew the four screws Z that fasten the head A to the barrier 3 Lift the cable grommet C 4 Disconnect the connector B 5 Remove and overturn the head A 6 Remove the BI B...

Page 19: ...connections Check that the manual lock release system works Check that the boom is balanced correctly as indicated in chapter 13 Check that there are now plants within the radius of action of the boo...

Page 20: ......

Page 21: ......

Reviews: