GuardCom Installation Manual
guardcom_installation_manual_v1.0.docm
Publicly available
p. 14 of 31
3.2.1
Option B (continued)
–
Installation of GuardCom
Figure 10. Outline of the GuardCom prior to mounting a custom made VL-marker. The depicted conveyor station is not a commercial
ROEQ product.
Follow these guidelines to install the GuardCom with a custom made VL-Marker:
Step Instruction and illustration
1.
The GuardCom must be placed in the correct height ensuring a gap between cargo and top
of the Guard (not the top of the Guard
Com
) when the Guard is open:
Note: The stroke of the Guard is 30 mm (1,2”):
Cargo
Rolls on the
station
Ga
p
=
9
±
1
mm
(0
.3
5
"
±
0
.0
4
)
"
Guard
(in open
position)