2.
Preparation
User Guide
Page 2-2
3. When planning for electrical power, make sure you have more power than the total power
requirements specified for all components. Also make certain that the power load is
distributed evenly among circuits to that location. Consult an electrician or other expert if you
need assistance with planning for the power needs for your components.
4. Make sure that the power outlets for all hardware components are grounded according to
local and national standards. Consult an electrician if you need assistance with grounding.
2.4 Operating Environment
The operating environment for the
Accustor PR3600
must meet certain requirements:
1. Verify that the temperature range of the chosen location is within the limits established for
the system and all other components.
2. Make certain that the chosen location has adequate ventilation to maintain the necessary
temperature range.
3. If there are multiple hardware components installed at the chosen location, consider
additional cooling measures to assure efficient operation of the system and other
components.
4. Environment parameters:
a. Operating temperature: 0°C to 40°C (32°F to 104°F)
b. Operating humidity: 5-85%, non-condensing
c. Storage humidity:5%-95%, non-condensing
2.5 Security
To ensure the security of the
Accustor PR3600
, make certain that the chosen location
meets your security requirements.
Summary of Contents for accustor PR3600
Page 1: ...Accustor PR3600 Storage User Guide Rocstor Version V1 1 TM...
Page 7: ...1 Introduction User Guide 1 Introducing Accustor shareable Thunderbolt Storage System...
Page 15: ...2 Preparation User Guide 2 Preparing to Install Accustor PR3600...
Page 18: ...3 Installation User Guide Page 3 1 3 Installing the Accustor PR3600...
Page 24: ...4 How to Use User Guide 4 Configure Accustor PR3600 on RAIDGuardX...
Page 51: ...5 RAID User Guide 5 RAID Overview...
Page 55: ...Appendices User Guide Page 6 1 6 Appendices...