Unpacking
Before installation, unpack the starter panel from its packaging and perform a
complete visual inspection of the panel. Inspect all components for damage
related to shipping and handling, including the controller, wiring, and fault
contactor. Claims for damage must be made to the carrier as soon as possible
after receipt of the shipment.
Mounting
The small footprint of the starter panel makes it ideal for mounting in the
same space previously occupied by legacy solid-state starters and traditional
full-voltage starters. The starter panel does not have mounting requirements
beyond the basic footprint of the panel.
The product can incorporate a small cooling fan. There are no additional
cooling requirements for the product. However, it is good practice to leave at
least 6 inches (15.24 cm) of free space above and below the unit for ideal air
flow.
Dimensions
Figure 2 - Panel Dimensions for 32, 51, and 64 A Elevator Panels
Note
Information
1
This screw is intended to secure a prepared bonding conductor (example: a bonding conductor with a
crimped-on lug) or a suitable terminal for connection of an unprepared bonding conductor (example: a
bonding conductor with a stripped wire end). This screw is not intended for a direct field wiring
connection of an unprepared bonding conductor or equipment grounding conductor.
4.56
(115.7)
5.67
(144.0)
7.01
(178.0)
6.50
(165.1)
5.00
(127.0)
4x Ø 0.220 thru
(5.6)
CAT. XXXXXXXX SER. B
T6 T4 T5