SmartGuard 600 Controllers
9
Publication 1752-IN001C-EN-P - January 2009
3. In the the New Entry pop-up dialog box, type the IP address you want to
assign to the device, and click OK.
The controller appears in the Relation List.
For detailed information on EtherNet/IP communication, refer to the EtherNet/IP
Performance and Application Solution, publication
ENET-AP001
.
Install the SmartGuard 600 Controller
To install the SmartGuard 600 controller, you must mount it on the DIN rail, wire
the terminals, and make communication connections.
Mount the SmartGuard 600 Controller
IMPORTANT
For effective cooling:
•
mount the controller on a horizontal DIN rail. Do not mount the controller vertically.
•
provide a gap of at least 50 mm (2.0 in.) above and below the controller and 5 mm
(0.20 in.) on each side.
•
select a location where air flows freely or use an additional fan.
•
do not mount the controller over a heating device.