
Robus Energy Ltd
9 of 26
MCS 0001RE
Issue 2.1
March 2014
Hydraulic installation of the boiler
A correctly executed installation ensures that the system functions properly. Both national/local
guidelines and requirements must always be observed. The boiler can be installed on a pressurized
system up to max 2.5 bar.
Standard load valve installation
Failure to correctly install the load valve will void any future warranty. The load valve, supplied with
the boiler, must be installed in the boiler return pipe work as shown in the diagram. This maintains a
minimum 55°C return temperature to prevent condensation forming within the boiler.
Basic Y-plan installation
The 3 port valve must “spring return” to a heating position. 230V is only applied to the valve during
hot water mode.
Summary of Contents for Black Star 10 Comfort
Page 1: ...Black Star Pellet System...
Page 5: ...Robus Energy Ltd 5 of 26 MCS 0001RE Issue 2 1 March 2014 Boiler Specifications...
Page 14: ...Robus Energy Ltd 14 of 26 MCS 0001RE Issue 2 1 March 2014 Electrical Connections...
Page 23: ...Robus Energy Ltd 23 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting...
Page 26: ...Robus Energy Ltd 26 of 26 MCS 0001RE Issue 2 1 March 2014 CE declaration of conformity...