Robus Black Star 10 Comfort Manual Download Page 4

 

 

Robus Energy Ltd 

 

4 of 26 

MCS 0001RE 

Issue 2.1 

March 2014 

 

The Clean Air Act 1993 and Smoke Control Areas

 

 

The  Robus  Black  Star  Comfort  range  of  boilers  listed  below  has  been  recommended  as  suitable  for  use  in 
smoke  control  areas.  The  recommended  fuel  for  the  boiler  is  6mm  or  8mm  diameter  wood  pellets  to  EN 
14961 Part 2 class A1 wood pellets only. 

 

Robus Black Star 10 Comfort 
Robus Black Star 14 Comfort 
Robus Black Star 24 Comfort 
Robus Black Star 45 Comfort 

 

Under the Clean Air Act local authorities may declare the whole or part of the district of the authority to be a 
smoke control area. It is an offence to emit smoke from a chimney of a building, from a furnace or from any 
fixed boiler if located in a designated smoke control area. It is also an offence to acquire an "unauthorised fuel" 
for use within a smoke control area unless it is used in an "exempt" appliance ("exempted" from the controls 
which generally apply in the smoke control area).  

 

The  Secretary  of  State  for  Environment,  Food  and  Rural  Affairs  has  powers  under  the  Act  to  authorise 
smokeless  fuels  or  exempt  appliances  for  use  in  smoke  control  areas  in  England.  In  Scotland  and  Wales  this 
power rests with Ministers in the devolved administrations for those countries. Separate legislation, the Clean 
Air (Northern Ireland) Order 1981, applies in Northern Ireland. Therefore it is a requirement that fuels burnt or 
obtained  for  use  in  smoke  control  areas  have  been  "authorised"  in  Regulations  and  that  appliances  used  to 
burn solid fuel in those areas (other than "authorised" fuels) have been exempted by an Order made and signed 
by the Secretary of State or Minister in the devolved administrations. 
 

 

Further 

information 

on 

the 

requirements 

of 

the 

Clean 

Air 

Act 

can 

be 

found 

here 

http://smokecontrol.defra.gov.uk/

  

 

Your  local  authority  is  responsible  for  implementing  the  Clean  Air  Act  1993  including  designation  and 
supervision of smoke control areas and you can contact them for details of Clean Air Act requirements”

 

Fuel and warranty 

The Robus Black Star and Robus Black Star Comfort  pellet boilers are designed for use  with EN-plus A grade 
wood  pellets  only.  The  use  of  substandard  fuels  will  compromise  the  efficiency,  reduce  the  life  span  and 
invalidate the warranty of the appliance.  

What is EN-Plus? 

 

EN-Plus is the European Quality Standard for the manufacture and supply of wood pellets. Manufacturers and 
Distributors who have the EN-Plus standard have been certified as meeting the required quality standards and 
they are entitled to display the EN-Plus logo and their own unique License Number.

 

Summary of Contents for Black Star 10 Comfort

Page 1: ...Black Star Pellet System...

Page 2: ...ntroller and is therefore not described here in this manual It is recommended to study the menus prior to initial start Save this manual so you always have it available when needed Page 3 Comments on...

Page 3: ...mell smoke or see any other indication of improper draft of the chimney all operation of your system must cease immediately and must remain so until a solution to the draft problem has been resolved C...

Page 4: ...rs in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obta...

Page 5: ...Robus Energy Ltd 5 of 26 MCS 0001RE Issue 2 1 March 2014 Boiler Specifications...

Page 6: ...aft stabilizer Installation of the burner Installing the burner on the boiler 1 Check that the burner is not damaged during transport 2 Check that the burning grate is inserted correctly in the burner...

Page 7: ...y thermostat Mount on either the left or right side of the boiler as displayed in image Note Functional testing of the high limit safety thermostat is required before starting up the boiler To test pr...

Page 8: ...with 230V AC through the socket located on the back of the boiler In the control box make a connection to output L5 L10 The cleaning system will run every time the burner conducts a blower cleaning s...

Page 9: ...d system up to max 2 5 bar Standard load valve installation Failure to correctly install the load valve will void any future warranty The load valve supplied with the boiler must be installed in the b...

Page 10: ...the outdoor temperature The mixing valve mixes high temperature water from the 3 port valve with cooler return water from the heating system The 3 way valve is controlled by the Version 10 controller...

Page 11: ...ing via the vacuum transport Steel Hopper Available in 4 different models 60x60cm 200L 140 kg 80x80cm 320L 220kg 80x140cm ext 500L 350kg 100x100cm 500L 350kg Fabric Hopper Available in three different...

Page 12: ...amples of ways to configure your vacuum transport Big bag Throw the mole in the bag Easy way to transport 1 ton Flat bottom hopper Is a top fed option that maximizes space by minimizing ceiling height...

Page 13: ...rch 2014 Wiring Diagram There may be factory installed wiring on the outputs L5 L10 L5 may be factory fitted for the moving grate L6 may be factory fitted for the compressor cleaning Remove these if t...

Page 14: ...Robus Energy Ltd 14 of 26 MCS 0001RE Issue 2 1 March 2014 Electrical Connections...

Page 15: ...Robus Energy Ltd 15 of 26 MCS 0001RE Issue 2 1 March 2014 Optional Equipment The controller supports the following equipment to aid in making adjustments cleaning and trouble shooting...

Page 16: ...ppear on the screen indicating that the controller is online If you do not have the possibility of a direct cable connection these adapters picture on right can be used They can establish a connection...

Page 17: ...ved you will have your own page and burner dashboard After a short period of time you should see data streaming from the burner If you would like to view your system from your smart phone then downloa...

Page 18: ...works NBE observes abnormalities on your graphs You will be contacted by E mail where we ask your permission to make changes NBE will assess your graphs and the burner reaction pattern and make adjus...

Page 19: ...tput up until you have a stable flame at 10 power 6 Once the burner is activated an ignition will be made After approx 20 minutes the burner will reach a nominal output 100 If necessary lock the burne...

Page 20: ...ey Sweeper may not always be removing the ash from the chimney flue Never dispose of hot ashes in the trash but let it cool in a metal bucket Hot ashes can re ignite Burner head Remove any ash or cind...

Page 21: ...you when to change parts and perform service Please note that service indicators are only expectations based on experience Components can easily have a longer lifetime than suggested by the service in...

Page 22: ...Robus Energy Ltd 22 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting We have collected the most typical solutions to small problems...

Page 23: ...Robus Energy Ltd 23 of 26 MCS 0001RE Issue 2 1 March 2014 Trouble shooting...

Page 24: ...oiler temperature 70C degrees 10 degrees up in the boiler temperature gives 10 degrees more smoke temperature 6 Suitable return temperature 55C degrees Internal surface temperatures below 47 C will ca...

Page 25: ...s are only made by agreement with Robus Energy To the extent that Robus Energy is liable to the purchaser Robus Energy s liability is limited only to direct loss and not to damages incurred by connect...

Page 26: ...Robus Energy Ltd 26 of 26 MCS 0001RE Issue 2 1 March 2014 CE declaration of conformity...

Reviews: