![Robur GAHP-AR S Installation, Use And Maintenance Manual Download Page 17](http://html1.mh-extra.com/html/robur/gahp-ar-s/gahp-ar-s_installation-use-and-maintenance-manual_1471550017.webp)
Features and technical data
Installation, use and maintenance manual – Gitié ARAY
17
1
Figure 1.13
Gitié package wiring diagram with KIT/2 C1 or with KIT/4 C1
MOD.0 GAHP or ACF unit
MOD.1 AY00-120 unit
SCH1
Controller S61
SCH5
S70+AY10 electronic boards
TER
Package power supply terminal box
J2-J10 Control jumpers of system water pumps ("closed")
MA
Terminal block
PM0-PM1 System water pumps
A
Position of pumps flow rate adjustment screw
Figure 1.14
CAN connection between AY10 board and S61 (pre-wired in the factory)
SCH5
S70+AY10 electronic boards
SCH1
Controller S61
J1
Jumpers CAN-BUS on AY10 board and S61 board
A
Terminal node connection - (3 wires; J1 jumpers = "closed")
C
Terminal node connection - (3 wires; J1 jumpers = "closed")
H,L,GND Data signal wires (ref. cables table)