
24
Installation, Operation and Maintenance Manual - Ed.07/2005
EVOLUZIONE series natural gas/LPG heaters
3.3.9 WIRING DIAGRAMS FOR THE INSTALLATION OF SEVERAL HEATERS
ROBUR has control units for the control and management of several heaters (see “List of accessories” on
page 27). If these controls are not used, follow the diagrams below.
In these conditions, power and ventilation modulation will not occur.
Figure 23
– WIRING DIAGRAM FOR OPERATION OF SEVERAL HEATERS WITH A SINGLE TIMER AND SEVERAL THERMOSTATS
Figure 24 –
WIRING DIAGRAM FOR OPERATION OF SEVERAL HEATERS WITH A SINGLE TIMER AND A SINGLE AMBIENT THERMOSTAT
(solution with several relays)
NOTE
HEATER HEATER HEATER
RL1 RL2 RL3
P
L N L N L N
Z9 Z9 Z9
TA TA TA
N
L
I
230 V - 50 Hz
P
= PROGRAMMABLE TIMER
TA
= AMBIENT THERMOSTAT
RL1-2-3 = PROGRAMMED
CONTROL RELAY
HEATER HEATER HEATER
RL1 RL2 RL3
P
L N L N L N
Z9 Z9 Z9
N
L
I
230 V - 50 Hz
P
= PROGRAMMABLE TIMER
TA
= AMBIENT THERMOSTAT
RL1-2-3 = PROGRAMMED
CONTROL RELAY
TA