2. Installation
73
[2] Positioning in open/close and vertical directions
To achieve higher installation precision and repeatability for finger attachments, it is recommended that
each finger attachment be positioned by sandwiching the attachment between the positioning pin and the
side face of the finger, as illustrated below.
It is also recommended that a clearance of 3 mm or more be provided between the attachments so that
the gripped work part can be removed by turning the opening/closing screw in the event of power outage.
●
GRSS
Positioning pin
Positioning in open/close directions
Open/clo
se
directions
Finger attachment
Affixing bolt M3
Shoulder contact surface
Positioning in vertical directions
Vertical directions
Finger
Summary of Contents for GR3LM
Page 2: ......
Page 4: ......
Page 71: ...2 Installation 65 4 GRHM Shaft bracket Flange bracket 5 GRHB Flange bracket Shaft bracket ...
Page 74: ...2 Installation 68 depth 8 depth 8 GRS GRM ...
Page 77: ...2 Installation 71 depth 5 depth 6 φ φ GR3SS GR3SM ...
Page 78: ...2 Installation 72 GR3LS GR3LM ...
Page 127: ......