CORAYVAC
®
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
40 of 54
SECTION 12: OPERATION AND MAINTENANCE
Figure 29:
CORAYVAC
®
System Se
q
uence of Operation Chart
Cut/Pinch Hazard
Wear protective gear
during installation,
operation and service.
Edges are sharp.
WARNING
Failure to follow these instructions can result in death, electric shock, injury or property damage.
Burn Hazard
Allow heater to cool
before service.
Tubing may still be hot
after operation.
Explosion Hazard
Turn off gas supply to
heater before service.
DANGER
Electrical Shock Hazard
Disconnect electric
before service.
More than one
disconnect switch may
be required to
disconnect electric from
heater.
Heater must be
connected to a properly
grounded electrical
source.
KEY TO
SYMBOLS
T0
T8
T3
T5
T4
T6
T2
T1
2 minute
post purge
Loss of Pressure
Switch Signal
30 sec approx.
T7
Pressure
Switch
PS
Thermostat
Pump
Operating
Power to
Burners
PS
T9
Summary of Contents for CoRayVac CRT-10
Page 2: ......
Page 4: ......
Page 6: ......
Page 53: ...SECTION 14 TROUBLESHOOTING 47 of 54 14 1 Troubleshooting Flow Chart ...
Page 61: ......