Monitor Panel
64
© 2015 by Roadtrek, Inc.
Optional Propane Generator
To start the generator, push the generator toggle switch on the top end (START). Allow the generator to run for a couple of
minutes before turning on heavy loads such as the air conditioner. The hour meter to the right of the generator start switch
measures hours of generator operation.
To stop the generator, first shut down all heavy loads, let the generator run for a few minutes to cool down, then press the
bottom (STOP) end of the rocker switch.