Beacon 110 Rig Monitor Operator’s Manual
14
WARNING:
Make all connections to the Beacon 110 Rig Monitor before you plug in or turn
on the DC power source. Before you make any wiring adjustments, always verify
that all power sources are not live.
Routing Wiring Into the Beacon 110 Housing
Wiring must be brought into the housing through one of the two factory-installed conduit hubs on
the bottom of the housing.
Do not drill into the Beacon 110 housing for any reason. Drilling the Beacon 110 housing and
routing wiring through holes not factory drilled will void the warranty and could result in:
•
Damage to internal components from the drilling process.
•
Moisture damage to internal components from poorly sealed holes.
•
Unpredictable Beacon 110 behavior due to EMI/RFI interference caused by wires routed
across the PCBs.
•
Possible shorting of Beacon 110 components due to wires routed across the PCBs.
Connecting DC Power
Perform the following functions to connect the Rig Monitor to DC power. One end of the battery
cable is already factory wired to the appropriate terminals at the Rig Monitor housing. Use the other
end to connect a 12 VDC battery.
NOTE:
Be sure to turn off the Beacon 110 Rig Monitor before connecting or disconnecting it
from the 12 VDC battery.
1. Turn off, unplug, or disconnect all incoming power to the Rig Monitor.
2. Open the housing door, then place the power switch in the OFF position.
3. Connect the red battery clamp to the (+) terminal of the 12 VDC battery.
4. Connect the black battery clamp to the (-) terminal of the 12 VDC battery.
Connecting External Alarms
Perform the following procedure to connect external alarms to the Rig Monitor’s Fail or Alarm 2
terminals. The Alarm 1 terminals are factory wired and are not available for field use.
1. Disconnect the battery clamps from the + and - terminals of the 12 VDC battery.
2. Open the housing door, then place the power switch in the OFF position.
3. Locate the alarm terminal strip. See Figure 1 to assist you in locating the alarm terminal strip.
4. Install an appropriately rated cable bushing in the Rig Monitor housing. Both factory supplied
conduit hubs are used in the Rig Monitor, so you will need to drill a hole in the housing for a
conduit hub and cable bushing.
CAUTION:
Only use the two factory installed conduit hubs on the bottom of the housing for
wire entry into the housing. Do not drill the housing for any reason. See “Routing
Wiring Into the Beacon 110 Housing” on page 14 for more information.
5. Guide the wiring of the external alarm through the new cable bushing.