AirLink 7032 Gas Monitor Operator’s Manual
Chapter 3: Installation
•
11
Chapter 3: Installation
Mounting the AirLink 7032 Gas Monitor
1. Select the mounting site. When you select the mounting site, consider the following factors:
• Is an AC or DC power source available?
• Is a vertical surface available to mount the AirLink 7032?
• Is there enough room to open the housing door and make wiring connections?
• Are the display screen and status lights visible?
2. Close and latch the housing door.
3. Prepare the selected mounting site as required to mount the AirLink 7032. It should be
mounted at eye level (4 1/2 to 5 feet from the floor). Refer to Figure 3 for the outline and
mounting dimensions.
4. Position the monitor on the vertical mounting surface.
5. Insert maximum 1/4” bolts or screws through the slots in the mounting feet at each corner of
the housing to secure the housing to the mounting surface.