Chapter 3 - Start-Up & Operating Parameters
3.1
Pre-startup System Inspection
1.
Visually inspect the entire system for obvious damage or leakage. Fix all issues that are
found. If major shipping damage is found contact RIX for repair or replacement parts.
2.
Ensure that any safety guards are securely attached.
3.
Ensure supply pressure is within the range stated in
Compressor Specifications
.
3.2
O2 Burn-In Procedure
This procedure should be followed at initial start-up and anytime the compressor or associated
plumbing is disassembled and exposed to the atmosphere. All components must be oxygen clean
before proceeding.
1.
Pressurize the system with clean, dry nitrogen or with a clean, dry nitrogen/oxygen mixture
not exceeding 30% oxygen.
2.
Run compressor at conditions stated in
Compressor Specifications
, using a closed loop if
necessary.
3.
Slowly inject oxygen into the inlet while venting the compressor discharge until the unit is
running on pure oxygen. This step should take at least 30 minutes. This will allow any
organic materials left in the system to safely oxidize.
3.3
Start-Up
After performing the pre-startup system inspection, start the unit. When starting the compressor
for the first time or after servicing, check for leaks in the plumbing – see
Section 7.2
for
recommended leak check procedure. After correcting any leaks in the system, restart the unit and
observe gas pressures and temperatures. The pressure will increase based on back pressure from
the User’s downstream plumbing. Gas temperature will also rise in conjunction with the
compression ratio of each stage.
All shutdown devices and control logic should be tested before the system is put into autonomous
operation.
Summary of Contents for 2PS-15-115
Page 37: ...RIX Industries 040910 01 Page 28 FIGURE 1 COMPRESSOR CROSS SECTION FASTENER DETAIL ...
Page 38: ...RIX Industries 040910 01 Page 29 FIGURE 2 COMPRESSOR CROSS SECTION PUMP DETAIL ...
Page 39: ...RIX Industries 040910 01 Page 30 FIGURE 3 1ST STAGE VALVE DETAIL ...
Page 40: ...RIX Industries 040910 01 Page 31 FIGURE 4 2ND STAGE VALVE DETAIL ...
Page 41: ...RIX Industries 040910 01 Page 32 FIGURE 5 EXTERIOR FASTENER DETAIL ...
Page 42: ...RIX Industries 040910 01 Page 33 FIGURE 6 MOTOR AND CONTROL BOX MOUNTING ...
Page 43: ...RIX Industries 040910 01 Page 34 FIGURE 7 SUCTION PLUMBING DETAIL ...
Page 44: ...RIX Industries 040910 01 Page 35 FIGURE 8 INTERSTAGE PLUMBING DETAIL ...
Page 45: ...RIX Industries 040910 01 Page 36 FIGURE 9 FINAL DISCHARGE PLUMBING DETAIL ...
Page 46: ...RIX Industries 040910 01 Page 37 FIGURE 10 COOLING FAN SUB ASSEMBLY DETAIL ...
Page 47: ...RIX Industries 040910 01 Page 38 FIGURE 11 BELT INSTALLATION DETAIL ...
Page 48: ...RIX Industries 040910 01 Page 39 FIGURE 12 GUARD MOUNTING DETAIL ...
Page 49: ...RIX Industries 040910 01 Page 40 FIGURE 13 CONTROL BOX DETAIL 1 OF 2 ...
Page 50: ...RIX Industries 040910 01 Page 41 FIGURE 14 CONTROL BOX DETAIL 2 OF 2 ...
Page 51: ...RIX Industries 040910 01 Page 42 FIGURE 15 CONTROL BOX WIRING DIAGRAM ...
Page 52: ...RIX Industries 040910 01 Page 43 FIGURE 16 ELECTRICAL SCHEMATIC ...
Page 53: ...RIX Industries 040910 01 Page 44 FIGURE 17 FLOW SCHEMATIC ...
Page 57: ......
Page 58: ......