IMPORTANT: Position P-2A and P-2B
profiles at back of greenhouse.
FRONT
BACK
T-bolt Placement Code
T-bolts used in steps 1.4A and 1.4B
T-bolts used in steps 2 through 10
T-bolts used in step 11
WWW.RSIWW.COM
10 of 45
Install T-bolts into inside and
outside bolt tracks as shown below.
Some of the T-bolts are secured in
this step. Most are secured in later
steps. Pay careful attention to
ensure you have the correct number
of T-bolts in the correct bolt track
in each profile. The profiles have
different amounts of T-bolts on the
inside and outside bolt tracks.
1.2
NOTE: Instructions identify twenty T-bolts
necessary for securing to ground in step 11.
IMPORTANT: When assembling base,
make sure the profiles are straight and
flush against each other. Secure profiles
together, and ensure corners are square.
The diagonal measurements on inside
corners should be equal. Secure corners
to desired foundation until assembly is
completed. We recommend using a two
by four platform.
S-7
107