27
27
27
ROLLER DOOR
INSTALL FIRST BRACKET
• Measure the door curtain width and mark where edge of curtain will be,
allowing for over lap on each side of the opening.
• Add clearance of 20-30mm from edge of curtain to inside edge of bracket
to determine positioning of the bracket.
• Headroom. Measure up 120mm from underside of the lintel.
• Mark two hole positions using top and bottom slots on the bracket.
• Drill both holes, then attach bracket using the 50mm x 10mm coach
screws and washers supplied.
B
120mm
Line for edge of door
20-30mm
INSTALL SECOND BRACKET
•
Using a water level or level /straight edge,
mark the position for the second bracket
•
Re-check levels then drill and fi x as with
fi rst bracket.
PLACE DOOR ON BRACKET
•
Do not cut plastic or packaging yet.
•
Using two persons and correct lifting techniques, lift door onto the brackets (the right way round so that the door will roll down from the front of the
opening).
•
Immediately loosely fi t the “U” bolts (K) , saddles (L) , washers and nuts (M) to the brackets in position
shown. Fitting the ‘U’ bolts eliminates the door falling from the brackets. (Do not tighten yet)
CAUTION:
The brackets must be
perfectly level for the door to operate.
Equal
Equal
Water
Level
Hose