Rack Installation Guide
3
Rack Installation Guide
These instructions describe how to install models 250, 550, 1050, 2050, 5050, 6050, 7050, 9350; CSH-250, CSH-
1050, CHS-2050, WWA-1000, WWA-2000, models 3000, 3010, 5000, 5010, 8000, 8500; and models 3020, 3520,
5520, 6020, 6120, 9200 in a standard Telco-type rack. It includes the following sections:
next
“Rack Installation Guidelines” on page 5
“Required Tools and Equipment” on page 5
“Mounting Series 250 and 550 to a Rack” on page 5
“Mounting Series 1050 and 2050 to a Rack” on page 6
“Mounting Series 5050, 6050, 7050, and 9350 to a Rack” on page 14
“Mounting Models 3000, 3010, 5000, and 5010 to a Rack” on page 18
“Mounting Models 3020, 3520, 5520, 6020, 6120, and 9200 to a Rack” on page 21
Caution:
All 3U systems must be mounted to a four-post rack; they cannot be mounted to a two-post rack.
Important:
For 3U xx20 models reseat all hard disks prior to powering the unit on. Reseat 3U xx20 disks anytime the
Steelhead appliance is shipped to a new location.