3
Compartment Racks VX IT / Compartment Racks VX IT / Baies de colocation compartimentées VX IT
Contents
Page
1.
Declarations of conformity
and approvals
2.
3.
Function description
and components
3.3
4.
4.3
Releasing the packing bands
and unpacking
4.3.2
Dismantling the
front/rear doors
Removing any accessories
supplied loose
4.3.5
Lifting the rack off of the pallet
Removing the cardboard
from the bottom
Optional installation of
the base/plinth
Installing castors or
levelling feet
Moving the rack to
the installation site
4.3.9
Depth adjustment of the
482.6 mm (19˝) level
4.3.10 Baying the rack (optional)
4.3.11 Securing the rack to the fl oor
Page
Installing the
customer hardware
Installing the power and
network cables
6.3
– CMC III infrared access sensor
– PDU basic – Power distribution 68
CMC III online
comfort handle VX
Overview of parts without electri cally
conductive connection
Overview of connection points for
protective earthing
Accessories for provision of
protective earthing
6.5
Re-installing the removed
enclosure panels
Fitting the front/rear doors –
l/h door hinge (swapping hinge
to opposite side)
Fitting the one-piece
side panels
8.
9.
10.
11.
13.
15.