RITE-HITE VBR-300 DOK-LOK Owner’s Manual
7
Typical Installation Views
Installation/Application Information
A
DOK-LOK
vehicle restraint may be installed on docks with or
without levelers. Consult
RITE-HITE
for proper application.
Follow the seven (7) step installation procedure below:
1. Inspect
DOK-LOK
vehicle restraint materials.
2. Assemble track to base.
3. Install
DOK-LOK
vehicle restraint to dock face.
4. Install hydraulic components.
5. Install electrical components.
6. Fill and bleed hydraulic system.
7. Install signs.
8. Test operation.
Inspect
DOK-LOK Materials
Open and inspect all materials. Refer to
Figure 2
. Immediately
report any damage or material shortage. Study component
assemblies and determine their proper locations. Refer to
Figure 26, page 24
through
Figure 29, page 30
.
Assemble Track To Base
The VBR-300
DOK-LOK
vehicle restraint can be assembled
with a 29" or 27" maximum height. Refer to the
RITE-HITE
Application Information provided with the
DOK-LOK
vehicle
restraint for correct height. Follow the steps below to assemble
roller track to base.
1. Remove tape securing the barrier rollers to the barrier.
2. Position barrier in the bottom of the roller track with
barrier rollers installed.
Figure 3
: Flush Mount VBR-300
DOK-LOK
with Leveler in Recessed Pit
Post safety warnings and barricade work area, at
dock level and at ground level, to prevent
unauthorized use of the dock position.
Whether there is a leveler or not, a 4" thick bumper is
required. DO NOT install a
DOK-LOK
vehicle restraint
on docks without 4" thick bumpers. For thicker
bumpers consult factory.
DANGER
IMPORTANT
Figure 4
: Remove Tape Holding Rollers To Barrier