LRL Series Elevating Dock Lift Owner’s Manual
10
Pub. No. 1174-R1 - June 2004
INSTALLATION INSTRUCTIONS - CONT.
SHIM AND MOUNTING INSTALLATION
1. Square dock lift in pit area with spaces equal on all
sides. See figure 4.
2. Shim dock lift level to the floor and weld shims to the
frame. See figure 4.
3. By pressing the UP button, raise dock lift about eight
to twelve inches, check down speed and adjust if
required. See
Adjustments
.
4. Raise dock lift to working height and block dock lift at
roller end with base mounted maintenance strut. See
Safety Devices
.
LEG ROLLER
WELD TO
BASE FRAME
BLOCK TO PIT
WALL BEHIND
BASE HINGE
(BY OTHERS)
WELD TO
BASE FRAME
BLOCK TO PIT
WALL IN FRONT
OF LEG ROLLER
(BY OTHERS)
BLOCK TO PIT
WALL BOTH
ENDS
SHIM UNDER
ROLLER PATH
SHIM UNDER FIXED
END LEG CLEVIS
FIGURE 4 - SHIM INSTALLATION
• ALWAYS ground to the frame or front pit angle
when welding. DO NOT ground welding
equipment to any electrical components. DO
NOT ground to lift platform when welding
on lift frame. Damage to bearings or electrical
components may result.
• DO NOT connect green ground lead into
control box or junction box until all welding is
complete.
IMPORTANT